Existing Veg, Desc/Purp - CORRECT ANSWERS ✔✔temp or
perm bmp desi to stab soil and remove sups part from
sheet flow runoff.
Existing Veg, Objectives - CORRECT ANSWERS ✔✔1) Site
Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
Existing Veg, applic - CORRECT ANSWERS ✔✔1) Areas
within site where no const activity is occur
2) Areas where local, state and fed govt require
preservation
3) Areas where existing veg can be utilized for eros, sedi,
and storm water quality.
Existing veg: inspection - CORRECT ANSWERS ✔✔1)
Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
,4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics
Existing veg: maint - CORRECT ANSWERS ✔✔1) only
disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
Sched/Sequ, purp/descrip - CORRECT ANSWERS ✔✔Temp,
procedural control that involves creating a written plan to
address neck bmps and sequencing of construct activities
to mitigate the erosive effects of wind,water and
construct activities.
Sched/Sequ: object - CORRECT ANSWERS ✔✔1) site
planning & management
2) erosion control
3) sediment control
,Sched/Sequ: applications - CORRECT ANSWERS ✔✔1)
develop timetables for certain activities, paretic during
rainy season
Sched/Sequ: inspect - CORRECT ANSWERS ✔✔1) inclusion
of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.
Sched/Sequ: maintanence - CORRECT ANSWERS ✔✔1)
modify ached of active when changes are warranted
2) modify ached of active prior to rainy season to reflect
updated bmp info
Hydroseed: Des& purp - CORRECT ANSWERS ✔✔Temp or
perm bmp designed to reduce erosion and runoff by
applying mix of seed, fert and stabilizing emulsion.
Hydroseed: object - CORRECT ANSWERS ✔✔1) erosion
control
2) good housekeeping/ materials management
3) post construct management
, Hydroseed: targeted pollut - CORRECT ANSWERS ✔✔1)
sediment
2) nutrients
3) metals
4) ph
Hydroseed: imp consid - CORRECT ANSWERS ✔✔1) need
adequate moisture
2) additional mulch may be added
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Hydroseed: limitations - CORRECT ANSWERS ✔✔1) seed
mix approp for seasonal conditions
2) time of application per seasonal conditions
3) difficult on steep slopes
4) no pedestrian or vehicle traffic
5) avoid high winds
Hydroseed: inspect: - CORRECT ANSWERS ✔✔1) adequate
coverage of diet areas
2) signs of pedest or vehicle traffic
3) signs of animal activity