EXAM PAPER 2026 QUESTIONS WITH
ANSWERS GRADED A+
◍ C. Project Risk Management
D. Project Procurement Management
E. Project Integration ManagementHere are the Project Management
Knowledge Areas:Project Integration ManagementProject Scope
ManagementProject Time ManagementProject Cost ManagementProject
Quality ManagementProject Human Resource ManagementProject
Communications ManagementProject Risk ManagementProject
Procurement ManagementProject Stakeholder Management.
Answer: Which of the following are the Project Management Knowledge
Areas? Each correct answer represents a complete solution. Choose all that
apply.A. Project Budget ManagementB. Project Plan ManagementC. Project
Risk ManagementD. Project Procurement ManagementE. Project
Integration Management
◍ Identifies and organizes the scope of the project.
Answer: What is the purpose of WBS?
◍ A high school English teacher wants to assess students with a short story
writing assignment after presenting a unit about creative writing. Which
strategy should the teacher use to promote student engagement?.
Answer: Clearly discuss the expectations for the assignment
◍ The students in a science class are being assessed by completing a
worksheet in which they are to label a diagram pertaining to photosynthesis.
The teacher is addressing the standard, "Illustrate the process of
photosynthesis. "Which objective matches the given assessment and
standard?.
, Answer: Students will label a given illustration of the process of
photosynthesis with at least 85% accuracy.
◍ Project scope statement.
Answer: When taking over an incomplete project, what item should be of
most interest to the new project manager?
◍ After obtaining the results from the first exam, a biology teacher has the
goal of increasing student engagement for future assessments. How should
the teacher achieve this goal?.
Answer: Meet with students individually to set goals
◍ Parametric.
Answer: You're a manager of a large IT project. At the time you performed
your cost estimates, the vendor you've been working with provided you with
the following estimates:- Programming estimate: 320 hours at $135/hour.-
Project management estimate: 320 hours at $155/hour.- Testing estimate:
150 hours at $85/hour.Which type of estimate are these?
◍ A. Administering the change control process
C. Performing quality assurance/governance activities
D. Performance measuring and reportingHere are the activities involved in
the monitoring and controlling process:Monitoring the risks/issues
logPerformance measuring and reportingPerforming quality
assurance/governance activitiesAdministering the change control
processMonitoring the budget.
Answer: What are the activities involved in the monitoring and controlling
process?Each correct answer represents a complete solution. Choose all that
apply.A. Administering the change control processB. Defining the
high-level risksC. Performing quality assurance/governance activitiesD.
Performance measuring and reporting
◍ The chart shows student performance on a writing project for a language
arts class. An "X" indicates proficiency.Student Clarity Style Organization
Grammar. What is the area of greatest weakness for the class?.
Answer: Organization
, ◍ The students in a math class took an end-of-year standardized exam. The
average score for algebra concepts was 59%, and the average score for
geometry concepts was 87%.How should instruction be adjusted, based on
the results of the assessment?.
Answer: Spend more classroom time with algebra concepts during the next
year
◍ A logic and critical thinking teacher is currently addressing the standard,
"Compile evidence to support a statement." The objective for current
instruction is, "Given an if-then statement, write at least three statements to
support the conclusion.".
Answer: A presentation in which students defend the conclusion of an
if-then statement
◍ Students in an anatomy class were given a diagram to label at the end of a
lesson. The teacher found that 76% of students labeled several muscles
incorrectly, and 14% of students labeled several bones incorrectly. Which
instructional adjustment is appropriate, based on the results of the
assessment?.
Answer: Reteach the content about muscles in the next lesson
◍ For the final project for chemistry students, they were required to conduct
and document an experiment. The teacher found that the class average for
procedures was 86%, the class average for documentation was 52%, and the
class average for conclusions was 82%.How should instruction be adjusted,
based on the results of the assessment?.
Answer: Place a greater emphasis on documentation for the next group of
students
◍ Scope creep.
Answer: You work as a project manager for uCertify Inc. You have started a
small two months project. After one month, you have been asked to add
some functionality that is estimated to take an additional two weeks. You
have implemented the functionality without having approval. This is known
as which of the following?