Version |Already Graded A+
1. Arrival/Depar-
ture Airfield is the deploying service component's counterpart to the Contingency
Control Response Group (CRG). This organization is sized to the requirement.
Group
(A/DACG)
2. Global Air
Mobil- ity enables aerial deployment, employment, sustainment, and
Support Sys- redeployment of US forces throughout the range of military operations
tem (GAMSS) It lays framework to support mobility airlift
The interrelated processes that move information, cargo, and
passengers USAF, CONUS based units
3. Contingency
Re- sponse is a USAF organization tasked to deploy in order to secure, assess, open
Group (CRG)
and initially operate airbases for the USAF component of their regional
4. Maximum On Combatant Command.
Ground
(MOG)
broad term to describe the total number of aircraft capable of being
5. What is the
pur- pose of serviced on ground at any given time without delays to their mission
LOTS? timeline.
Provides the geographic combatant commander the option to choose
ott-load locations, such as bare beach, austere port, or a damaged fixed
port in order to achieve port access.
6. What are the • Allows for cargo to be delivered and ott-loaded closer to the point
ca- pabilities of
Rail? of need.
• Enablers will allow commanders to create pier facilities,
7. Programme conduct salvage, or provide floating crane support capabilities
d alongside ships and fixed facilities.
Movements
More Tons per Gallon • Eflciency • Economies of scale (Once
supervision is in place can add more train crews of just 4 Soldiers)
Are identified in advance of operations to allow for allocation of
transportation requirements among all available modes
1/
8
, CCC Transportation Exam with all Correct & 100% Verified Answers |Latest
Version |Already Graded A+
• Are usually
requested through
logistics channels,
including the
battalion or brigade
S4.
2/
8