Union Pacific Conductor
Final Exam – Questions
and Verified Answers Study
Guide
1 Guidehttps://www.stuvia.com/dashboard!@_)#*)(@$)($@*($@)($@*_
Page 1 of 20 Page 1
,Union Pacific conductor final 2026-04-10 Union Pacific conductor final.pdf
Save
U
n
i
o
n
P
a
c
if
i
c
c
o
n
d
u
c
t
o
r
fi
n
a
l
2 Page 2 of 20 Page 2
, Union Pacific conductor final 2026-04-10 Union Pacific conductor final.pdf
Terms in this set (97)
What is a length of a track between A. Block
consecutive block signal or between a
block signal and the end of the block
system limit.
A. Block
B. Main track
C crossing
What is the appearance of a fixed or B. Signal aspect
cab signal ?
A. Signal indication
B. Signal aspect
C. Signal reasons
According to rules hierarchy the C. System general order
system special instruction can be
updated by which of the following?
A. Service unit general order
B. General notice
C. System general order
What is an absolute signal that is C. Controlled signal
controlled by a controlled operator?
A. Track occupation signal
B. Stop and proceed signal
C. Controlled signal
Your duties require you to cross C. Both answers are correct
through a train or a standing cut of
cars. After proper protection is
provided and before crossing over
from one side of the equipment to the
other side, you should?
A. Choose equipment carefully, using
cars equipped with a crossover
platform and handholds (when
available).
B. On equipment where crossover
platforms and handholds are not
available, use end of car structural
bracing to maintain 3-point contact, il
sate to do so.
C. Both answers are correct.
What is a system of tracks, other than C. Yard
main tracks and sidings, that is used
for making up trains, storng cars, and
other purposes?
A. Siding
B. Main track
C. Yard
3 Page 3 of 20 Page 3