Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

WGU D361 - TASK 1 AND 2 COMBINED PRACTICE EXAMINATION 2026 QUESTIONS WITH ANSWERS GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
18
Cijfer
A+
Geüpload op
10-04-2026
Geschreven in
2025/2026

WGU D361 - TASK 1 AND 2 COMBINED PRACTICE EXAMINATION 2026 QUESTIONS WITH ANSWERS GRADED A+

Instelling
WGU D361
Vak
WGU D361

Voorbeeld van de inhoud

WGU D361 - TASK 1 AND 2 COMBINED
PRACTICE EXAMINATION 2026
QUESTIONS WITH ANSWERS GRADED A+

◍ PMBOK.
Answer: Project Management Body of Knowledge
◍ Triple constraint.
Answer: Time, Cost, and Scope
◍ Disadvantages of Projectized.
Answer: PM must have enough work to keep SMEs busy full-time or risk
loss to another project or functional area. SME assigned may not have the
most appropriate knowledge or expertise for the project. Approach is
expensive because of the duplication of personnel. Equipment and personnel
may be hoarded to ensure access to those resources.Team members lose
access to a repository of functional or technical expertise. Policies and
procedures may be applied inconsistently.Team members may be anxious
about post-project work
◍ PRINCE2.
Answer: Highly structured project management method which focuses on
the specification of the outputs rather than the coordination of activities
◍ SDLC Phase 4: Implementation.
Answer: The implementation phase brings the system to life. This includes
building the system, testing the system, converting the system, and then
training the users, with the input of the system design from Phase 3.
◍ PMBOK Major Planning Areas.
Answer: Integration, Scope, Risk, Procurement, Communications, HR,
Stakeholder, Quality, Cost, Time, Config, Change, Process Improvement,

, Requirement
◍ SDLC Phase 1: PlanningTask 2: Conduct Feasibility StudiesC - Cost.
Answer: Does the organization have the resources to build the proposed
system? It is not unusual to use cost-benefit analyses to ensure funding is
available for the entire project. Estimates should be liberal when budgeting
for unknowns.
◍ Pessimistic.
Answer: Has taken up to X time to complete
◍ Advantages of Functional (Departmentalized).
Answer: Lines of authority are clear. Departmental work is easily prioritized
by identified departmental authority. There is flexibility in the use of staff.
Subject matter experts (SME) available to work on multiple
projects.Knowledge and experience readily shared between functional
specialists. Technical continuity exists within the organization. Professional
growth and career paths for the staff are clearly defined
◍ Ratio top-down method.
Answer: Uses experience from prior projects to estimate the overall cost of
the current project
◍ Monitor & Control (Process #4 - Iterative).
Answer: Assess whether project plan is implemented, outcomes and
deliverables are as expected. Also, to get the project team back on the plan
or make adjustments to the plan in order to achieve the desired outcomes
and deliverables
◍ Non-numeric project selection models.
Answer: Sacred cow, Competitive / Operating necessity. Not based on
traditional measures (ROI, profit, revenue, etc.).
◍ SDLC Phase 2: AnalysisTask 5: Create a Data Model.
Answer: This task identifies tables and fields for a new or revised database.
◍ Apportion top-down method.

, Answer: In addition to Ratio, takes into consideration specific functionality
or types of work that will be required. Overall project cost must be provided
based on the customer's budget or similar projects. The overall budget is
then allocated to the major work areas required in the project (design,
programming, testing, documentation, user training).
◍ Reinforcing Change - Phase 3 of Procsi.
Answer: Collect and analyze feedback, diagnose gaps and manage
resistance, and implement corrective actions and celebrate successes
◍ SDLC Phase 2: AnalysisTask 4: Identify Personnel Procedures.
Answer: This task identifies the personnel needed to run the system, and the
procedures that must be followed.
◍ Risk Transference.
Answer: Transfer to third party that has capabilities or financial resources
beyond those found in the project to handle the outcomes should the risk
occur
◍ Project Life Cycle 4 Phases.
Answer: Define, Plan, Execute, Close
◍ SDLC Phase 2: AnalysisTask 1: Identify System Requirements.
Answer: This task puts pressure on the users of the system to identify every
task—daily, weekly, monthly, and yearly—the new system needs to support.
Strong interviewing skills are required to gather this detailed information
from users.
◍ SDLC Phase 3: Design - 5 tasks.
Answer: 1) Design Hardware2) Design Programs3) Design a Database4)
Create Job Descriptions5) Create System Procedures
◍ Opportunity cost.
Answer: if the organization spends money on a project, then other possible
uses of the money would need to wait
◍ Risk Mitigation.

Geschreven voor

Instelling
WGU D361
Vak
WGU D361

Documentinformatie

Geüpload op
10 april 2026
Aantal pagina's
18
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ProfessorBeatrice Havard School
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
10
Lid sinds
2 maanden
Aantal volgers
0
Documenten
6389
Laatst verkocht
1 week geleden
Professor_Beatrice7

I believe learning isn’t just about cramming it’s about clarity, growth, and building the confidence to conquer any challenge. That’s why you’ll find a handpicked collection of top notch, easy to digest study materials, smart summaries, and guides tailored to a wide range of subjects and learning styles. Whether you're gearing up for exams, brushing up on class notes, or just need that extra push, I have you covered. From quick-reference sheets to deep-dive notes, there’s something here for every learner. Think of this place as a place where productivity meets peace of mind. So settle in and let’s sharpen your focus and fuel your success, one file at a time. Thanks for making me your study partner. Let’s unlock your full potential together!

Lees meer Lees minder
5.0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen