when making a vertical lift using a four-point hookup, how many sling
legs are assumed to be supporting the load?
Give this one a try later!
four five
six three
Don't know?
2 of 83
Definition
,where would the CG of a load be located during a lift?
Give this one a try later!
equal distance between attachment
below the attachment points
points
above the attachment points centered above the boom pin
Don't know?
3 of 83
Definition
when spooling wire rope onto a tugger, what is the correct
procedure?
Give this one a try later!
wind an overwound drum from
wind an underwound drum from the
the opposite top side of the
same side of the spool
spool
wind an overwound drum from the wind a level drum from the top side
same bottom side of the spool of the spool
, Don't know?
4 of 83
Definition
the attached drawing illustrates a device for adjustment of
load and is termed a:
Give this one a try later!
turnbuckle belt buckle
eyebolt tower
Don't know?
5 of 83
Definition
what is used to prevent the load from being crushed by the squeezing
action of the slings upon lifting?
Give this one a try later!
, spreader bar wire rope clips
crane arm cross arm
Don't know?
6 of 83
Definition
How many persons may share a dedicated channel for the purpose of
coordinating operations?
Give this one a try later!
as many as are required per the
only two for safety reasons
lift plan
one to ensure clear communication a limited number as per regulations
Don't know?