if the boiler is generating 20,000 20,000
lb/hr of steam, it must be
supplied with ________ lb/hr of
feedwater
, from the deaerator, oxygen and through the vent
other noncondensable gases are
separated from the feedwater
and directed to the atmosphere
_________
a(n) ___________ system is a system of controll
measuring instruments and
controllers that work together to
control a process
one pound of water is needed to 1lb