Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

EXAC Section 4 Exam with accurate detailed solutions

Beoordeling
-
Verkocht
-
Pagina's
10
Cijfer
A+
Geüpload op
10-04-2026
Geschreven in
2025/2026

EXAC Section 4 Exam with accurate detailed solutions

Instelling
EXAC
Vak
EXAC

Voorbeeld van de inhoud

2



EXAC Section 4 Exam with accurate detailed solutions || || || || || || ||




Bond

- A financial security that represents a promise to repay a fixed amount of funds
|| || || || || || || || || || || || || ||




- Financial security for the performance of an obligation; usually a written document
|| || || || || || || || || || || || ||




supported by a pledge of collateral. || || || || ||




Surety

The party (company) that issues a bond which guarantees the performance of the person
|| || || || || || || || || || || || || ||




bonded (in construction, the contractor) to fulfill obligations under contract within the
|| || || || || || || || || || || ||




financial and time limitations stated in the bond. || || || || || || ||




Warranty (warranty against the quality) || || || ||




A statement of fact or quality intended to be relied upon by another party, carrying with it
|| || || || || || || || || || || || || || || || ||




an implied or express promise to make good any breach
|| || || || || || || || ||




Certificate of Substantial Performance || || ||




A certificate issued under the appropriate lien legislation attesting that the contract between
|| || || || || || || || || || || ||




the owner and the contractor is substantially complete.
|| || || || || || || ||




Holdback

"A percentage of the monetary amount payable under a (construction) contract, which is
|| || || || || || || || || || || || ||




held back as security for a certain period of time. The percentage and period of time are
|| || || || || || || || || || || || || || || || ||




based on the provincial lien legislation." || || || || ||




Lien

- legal claim on real property to satisfy a debt owed to the lien claimant by the property
|| || || || || || || || || || || || || || || || || ||




owner. This claim can carry the right to sell the property upon default.
|| || || || || || || || || || || ||




- a right to keep possession of property belonging to another person until a debt owed by
|| || || || || || || || || || || || || || || || ||




that person is discharged. || || ||




Shop Drawings ||




A drawing, prepared on behalf of the contractor to indicate precise details of the
|| || || || || || || || || || || || || ||




construction materials, for fabrication, production or installation. || || || || || ||




Shop Drawing Review || ||

, 2


First, Gen. Contractor reviews shop drawings. Second, architect and consultant review (snd
|| || || || || || || || || || || ||




approved construction dwgs prior to fabrication). Lastly, shop drawings are returned to
|| || || || || || || || || || || ||




contractor for use, use w/ change, or resubmission. || || || || || || ||




General Review/ Field Review || || ||




"Review during visits to the Project site (at intervals appropriate to the stage of the
|| || || || || || || || || || || || || || ||




construction)" ... "to determine that the Work is in general conformity with the construction
|| || || || || || || || || || || || ||




documents."
||




Project Management ||




"The process of planning, scheduling, directing, organizing and controlling all resources
|| || || || || || || || || || ||




(financial, physical and human) from the start to the completion of the project goals and
|| || || || || || || || || || || || || || ||




objectives." In many projects, the owner is, by default, the Project Manager (PM)."
|| || || || || || || || || || || ||




Construction Management ||




- Construction manager (CM) may take on the roles and responsibilities of an advisor, an
|| || || || || || || || || || || || || || ||




agent or a constructor. The CM is most frequently confined to:
|| || || || || || || || || ||




- Advising on, or preparing schedules, budgets, material selection and detailing, during the
|| || || || || || || || || || || || ||




design phase ||




- Advising on and arranging for all services and trade and supervising the activities of all
|| || || || || || || || || || || || || || || ||




trade contractors ||




Design-Bid-Build

CCDC 2 ‐ Stipulated Price Contract
|| || || || ||




CCDC 3 ‐ Cost Plus Contract || || || || ||




CCDC 4 ‐ Unit Price Contract || || || || ||




- Involves three parties: Owner, Consultant and Contractor
|| || || || || || ||




- Not always best value to customer as costs are generally higher
|| || || || || || || || || || ||




The owner contracts two separate agreements:
|| || || || ||




- The Consultants design and prepare construction documents, based on a predetermined
|| || || || || || || || || || || ||




budget.
- After bidding and negotiation, the job is awarded to the successful bidder as a fixed price
|| || || || || || || || || || || || || || || || ||




contract.
- The Contractor builds the project with the Consultants providing construction
|| || || || || || || || || || ||




administration and representing the owner. || || || ||

Geschreven voor

Instelling
EXAC
Vak
EXAC

Documentinformatie

Geüpload op
10 april 2026
Aantal pagina's
10
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$17.69
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Ruiz Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
96
Lid sinds
1 jaar
Aantal volgers
1
Documenten
13904
Laatst verkocht
2 weken geleden
Top-Quality Study Materials for Success – Ace Your Exams with Expert Resources!

Access high-quality study materials to help you excel in your exams. Get notes, summaries, and guides tailored to your courses!

3.2

15 beoordelingen

5
4
4
4
3
2
2
1
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen