According to SCTE- and NCTA-recommended trunk system map symbols, fiber-optic cable
|| || || || || || || || || || ||
is represented by - ✔✔Double arrows within a small circle on a solid line.
|| || || || || || || || || || || || ||
The forward path signal in a traditional tree-and-branch architecture - ✔✔Originates at the
|| || || || || || || || || || || || ||
headend and is transmitted downstream through coaxial trunk cable and trunk amplifiers.
|| || || || || || || || || || ||
In an HFC network, - ✔✔Processing equipment in the headend converts the forward RF
|| || || || || || || || || || || || || ||
signal to a light signal.
|| || || ||
During aerial plant construction, - ✔✔The strand is tensioned so its sag profile matches
|| || || || || || || || || || || || || ||
that of the overhead utility power lines.
|| || || || || ||
With underground plant construction, - ✔✔The fiber-optic and coaxial cables are often
|| || || || || || || || || || || ||
placed underground with other utility lines to jointly share construction costs.
|| || || || || || || || || ||
Standby power supplies - ✔✔Continue providing an output voltage even during a utility
|| || || || || || || || || || || || ||
power outage by using a backup power source.
|| || || || || || ||
Centralized power configurations - ✔✔Provide the advantage of increased reliability
|| || || || || || || || || ||
through sharing of expensive backup generators and sophisticated monitoring equipment
|| || || || || || || || || ||
among different power realms. || || ||
When transmitting broadband signals - ✔✔In a two-way hybrid fiber/coax (HFC) network,
|| || || || || || || || || || || ||
two or more individual optical fibers are required for each optical node location.
|| || || || || || || || || || || ||
, 2
RF trunk amplifiers - ✔✔Have attenuator pads, equalizers, and diplex filters that control
|| || || || || || || || || || || || ||
and route the RF signals.
|| || || ||
Verifying plant reliability includes - ✔✔Frequency response sweeping, which is adjusting
|| || || || || || || || || || ||
RF amplifier circuits to amplify all frequencies in the bandpass spectrum as equally as
|| || || || || || || || || || || || || ||
possible
Which of the following is a requirement in the process for measuring leakage using a dipole
|| || || || || || || || || || || || || || || ||
antenna, as required by the FCC? - ✔✔The antenna must be placed 3 meters from the
|| || || || || || || || || || || || || || || ||
system components and 3 meters from the ground.
|| || || || || || ||
Many cable companies require which type of leaks to be fixed? - ✔✔All types of leaks must
|| || || || || || || || || || || || || || || || ||
be fixed.
||
According to the FCC, the leakage log should contain which of the following? - ✔✔The
|| || || || || || || || || || || || || || ||
probable cause of the leakage. || || || ||
Which of the following FCC required information must a cable system keep on file for two
|| || || || || || || || || || || || || || || ||
years? - ✔✔Annual CLI calculations, regular (quarterly) monitoring programs, and a list of
|| || || || || || || || || || || || ||
all channels used in the aeronautical bands.
|| || || || || ||
If your leakage detector indicates there is a leak and displays a reading of 14 microvolts per
|| || || || || || || || || || || || || || || || ||
meter (uV/m) when you are 80 feet from a possible leak source, what is the approximate
|| || || || || || || || || || || || || || || ||
calculated level of the leak from 10 feet? - ✔✔112 uV/m. || || || || || || || || || ||
If a large signal leak is found in the aerial plant, what is a good first step in locating the
|| || || || || || || || || || || || || || || || || || || ||
leak? - ✔✔Drive around until an absolute peak is found.
|| || || || || || || || ||