STC EXAM QUESTIONS
WITH CORRECT
ANSWERS
Which team relays the proper shoring information and numbers to the layout team? -
Answer-Measuring team
Wetting of concrete is often required when using? - Answer-Diamond blades
Area security in domestic disasters is the responsibility of who? - Answer-State and
local government.
When giving crane hand signals, always stand to the left - rear of the crane. True or
false? - Answer-False
All of the following are signs of possible immediate secondary collapse, except? -
Answer-Stable debris
You are about to make entry into a void space to perform a breaching operation. Along
with the necessary breaching and breaking or cutting tools you will need certain support
equipment. Which will you NOT need? - Answer-TNT
Pre-cast concrete can be described as? - Answer-Concrete that has been cast at a
location other than the place it is to remain.
Which of the following statements concerning vertical shoring is incorrect? - Answer-
Vertical Shores are used to stabilize exterior walls.
Where are the wedges for the posts always installed in the door, window, and vertical
Shores? - Answer-Bottom
The term L.C.E.S. is the multi hazard safety plan, which stands for? - Answer-Lookouts,
communications, escape routes, and safe zones.
The safest and recommended method for lighting a cutting torch uses what type of
lighting device? - Answer-Spark lighting device
Based on area a ________ assembly area has a potential for the most trapped
occupants (1 per every 25 sq ft) - Answer-Public assembly area
WITH CORRECT
ANSWERS
Which team relays the proper shoring information and numbers to the layout team? -
Answer-Measuring team
Wetting of concrete is often required when using? - Answer-Diamond blades
Area security in domestic disasters is the responsibility of who? - Answer-State and
local government.
When giving crane hand signals, always stand to the left - rear of the crane. True or
false? - Answer-False
All of the following are signs of possible immediate secondary collapse, except? -
Answer-Stable debris
You are about to make entry into a void space to perform a breaching operation. Along
with the necessary breaching and breaking or cutting tools you will need certain support
equipment. Which will you NOT need? - Answer-TNT
Pre-cast concrete can be described as? - Answer-Concrete that has been cast at a
location other than the place it is to remain.
Which of the following statements concerning vertical shoring is incorrect? - Answer-
Vertical Shores are used to stabilize exterior walls.
Where are the wedges for the posts always installed in the door, window, and vertical
Shores? - Answer-Bottom
The term L.C.E.S. is the multi hazard safety plan, which stands for? - Answer-Lookouts,
communications, escape routes, and safe zones.
The safest and recommended method for lighting a cutting torch uses what type of
lighting device? - Answer-Spark lighting device
Based on area a ________ assembly area has a potential for the most trapped
occupants (1 per every 25 sq ft) - Answer-Public assembly area