CDT Exam Prep


Which of the following is not a management expertise that contractors bring to the project delivery
process?

A. Identifying codes and regulations applicable to the design

B. Experience with managing a construction budget in a risk-based setting

C. Knowledge of factors that influence cost, time, and quality

D. Ability to manage multiple subcontractors and suppliers - Answer-A. Identifying codes and regulations
applicable to the design.



Which of the following is a stage of the Facility Life Cycle?

A. Project Conception

B. Project Permitting

C. Facility Maintenance

D. Preliminary Project Description - Answer-A. Project Conception



The written formats can each be employed for a variety of applications; the chief advantage of using
standard formats is:

A. a standardizes numbering system.

B. a standardized location withing the Drawings for subject matter.

C. a standardized set of contracts between the owner and contractor.

D. a standardized means of organizing, storing, retrieving, and communication an enormous body of
data. - Answer-D. a standardized means of organizing, storing, retrieving, and communication an
enormous body of data.

,The design stage of a project includes all of the following except which one?

A. Preliminary project description

B. Engineering design criteria

C. Feasibility studies

D. Outline specifications - Answer-C. Feasibility studies



Which of the following is a component of the National CAD Standard (NCS)?

A. OmniClass

B. CSI CAD Layer Guidelines

C. MasterFormat

D. CSI Uniform Drawing System - Answer-D. CSI Uniform Drawing System



Which of the following entities assumes the bulk of risk in a construction project?

A. Owner Team

B. Supplier Team

C. Design Team

D. Contractor Team - Answer-A. Owner Team



Which of the following entities is responsible for design compliance with the authorities having
jurisdiction?

A. Owner

B. Architect

C. Plan Reviewer

D. Contractor - Answer-B. Architect

,Which of the following will the courts use to interpret specifications in the same manner as they
interpret contracts?

A. Autonomy to contract.

B. Professional negligence.

C. General takes precedence over specific.

D. Construction for the drafter. - Answer-A. Autonomy to contract.



It is not uncommon for a public owner to dictate the design and construction process for the different
delivery methods, which of the following are examples of this?

A. How safety will be controlled on the project site

B. How the architect's construction administration and the contractor's project management will be
conducted

C. AJH submittal requirements

D. Which financial institutions will provide bonding for the contractor's performance - Answer-B. How
the architect's construction administration and the contractor's project management will be conducted



What establishes the relationship between the Contractor and the A/E?

A. Applicable laws and regulations

B. Signed agreement

C. Third-party obligations

D. Special conditions - Answer-C. Third-party obligations



In the substitution process, the onus for researching and documenting the acceptability of the proposed
substitution is the responsibility of the:

A. Contractor

B. Owner

C. A/E

, D. Entity requesting substitution - Answer-D. Entity requesting substitution



Who's duty is it to ascertain that the Contract Documents are in accordance with the applicable building
codes?

A. Subcontractor

B. Contractor

C. Owner

D. A/E - Answer-D. A/E



Instructions to Bidders:

A. Are used only on private projects

B. Frequently are standard printed forms

C. May include the geotechnical report as an attachment

D. Are binding upon the contractor - Answer-B. Frequently are standard printed forms



Which of the following would be included in the Information Available to Bidders?

A. Bid security information

B. Environmental impact statement

C. Contract Times to complete the Work

D. Description of the Work - Answer-B. Environmental impact statement



The contractual relationship governed by the Conditions of the Contract is between:

A. Owner and Contractor

B. Architect/Engineer and Contractor

C. Owner and Subcontractors

D. Architect/Engineer and Subcontractors - Answer-A. Owner and Contractor

Geschreven voor

Instelling
Cdt
Vak
Cdt

Documentinformatie

Geüpload op
12 april 2026
Aantal pagina's
58
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$24.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Zanaya Arizona College Of Allied Health
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
74
Lid sinds
2 jaar
Aantal volgers
30
Documenten
10082
Laatst verkocht
3 weken geleden

4.5

12 beoordelingen

5
8
4
2
3
2
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen