CDT Exam Questions
Which of the following are NOT among the definitions given in Article 1 of the AIA A201? - Answer-a.
The Contract Documents
b. Order of Precedence of the Documents
c. Correlation and Intent of the Contract Documents
d. Building Information Models Use and Reliance
(B) Order of Precedence of the Documents
2. Which of the following is NOT listed as a significant difference in how public agencies dictate aspects
of the design and construction process? - Answer-a. Use of drawings and specification conventions
required by the agency
b. Processing of applications for payment.
c. Dictating how construction contracts are awarded.
d. Responsibility of design professionals to obtain competitive pricing for work results.
(D) Responsibility of design professionals to obtain competitive pricing for work results
The contractors team member who directs, manages and coordinates the day-to-day project activities of
the contractor's staff, suppliers and subcontractors is: - Answer-Superintendent
Activities that constitute the project include all of the following EXCEPT: - Answer-a. Constructing the
facility
b. Managing the completed facility
, c. Procuring materials, labor and equipment for construction
d. Designing the facility
(B) Managing the completed facility
UniFormat organizes information based upon: - Answer-Physical parts of a facility called functional
elements
The CSI Uniform Drawing System (UDS): - Answer-Establishes drawing set content and order
The contract documents come with what type of warranty under the Spearin Doctrine? - Answer-
Implied warranty
A project's sustainable design requirements may be based upon: - Answer-a. Owner driven initiatives
b. Utility rebate programs
c. Local or state regulations
d. All of the above
(D) All of the above
Who is responsible for purchase and maintenance of insurance protecting the owner against loss of use
of the owner's property or disruption of normal operations under A201? - Answer-Owner
Which of the five listed consecutive steps in the programming process are MISSING from the list below:
1. Establish goals
2. Collect and analyze facts
Which of the following are NOT among the definitions given in Article 1 of the AIA A201? - Answer-a.
The Contract Documents
b. Order of Precedence of the Documents
c. Correlation and Intent of the Contract Documents
d. Building Information Models Use and Reliance
(B) Order of Precedence of the Documents
2. Which of the following is NOT listed as a significant difference in how public agencies dictate aspects
of the design and construction process? - Answer-a. Use of drawings and specification conventions
required by the agency
b. Processing of applications for payment.
c. Dictating how construction contracts are awarded.
d. Responsibility of design professionals to obtain competitive pricing for work results.
(D) Responsibility of design professionals to obtain competitive pricing for work results
The contractors team member who directs, manages and coordinates the day-to-day project activities of
the contractor's staff, suppliers and subcontractors is: - Answer-Superintendent
Activities that constitute the project include all of the following EXCEPT: - Answer-a. Constructing the
facility
b. Managing the completed facility
, c. Procuring materials, labor and equipment for construction
d. Designing the facility
(B) Managing the completed facility
UniFormat organizes information based upon: - Answer-Physical parts of a facility called functional
elements
The CSI Uniform Drawing System (UDS): - Answer-Establishes drawing set content and order
The contract documents come with what type of warranty under the Spearin Doctrine? - Answer-
Implied warranty
A project's sustainable design requirements may be based upon: - Answer-a. Owner driven initiatives
b. Utility rebate programs
c. Local or state regulations
d. All of the above
(D) All of the above
Who is responsible for purchase and maintenance of insurance protecting the owner against loss of use
of the owner's property or disruption of normal operations under A201? - Answer-Owner
Which of the five listed consecutive steps in the programming process are MISSING from the list below:
1. Establish goals
2. Collect and analyze facts