Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

OPSM 4820 E1 EXAM QUESTIONS WITH ACCURATE ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
12
Cijfer
A+
Geüpload op
13-04-2026
Geschreven in
2025/2026

OPSM 4820 E1 EXAM QUESTIONS WITH ACCURATE ANSWERS...

Instelling
OPSM 4820
Vak
OPSM 4820

Voorbeeld van de inhoud

OPSM 4820 E1 EXAM QUESTIONS WITH
ACCURATE ANSWERS

Which system is concerned with planning and controlling all aspects of
manufacturing, including managing materials, scheduling machines and people,
and coordinating suppliers and key customers? - ANSWER The manufacturing
planning and control system

The development of which system is key to the success of any goods producing
company? - ANSWER An effective manufacturing planning and control system

What are the essential task of the MPC system? - ANSWER To manage the
utilization of people
To manage the utilization of equipment
To manage efficiently the flow of material
To respond to customer requirements.

The support activities of the MPC system can be broken roughly into how many
time horizons? - ANSWER three

In which time horizon, the system is responsible for providing information to
make decisions on the appropriate amount of capacity (including equipment,
buildings, suppliers, and so forth) to meet the market demands of the future? -
ANSWER long term

In which time horizon, the fundamental issue addressed by the MPC system is
matching supply and demand in terms of both volume and product mix? -
ANSWER medium term

In which time horizon, detailed scheduling of resources is required to meet
production requirements? - ANSWER short term

Which time horizon planning is necessary for the firm to provide the appropriate
mix of human resource capabilities, technology, and geographical locations to
meet the firm's future needs? - ANSWER long term

In which time horizon planning "customers" are provided information on
expected delivery times and communicating to suppliers the correct quantities
and delivery times for the material they supply. - ANSWER medium term

Which time horizon does involve time, people, material, equipment, and
facilities? - ANSWER short term

, ________________ planning balances the sales/marketing plans with available
production resources. - ANSWER sales and operation

The __________________ is the disaggregated version of the sales and operations
plan. - ANSWER Master production schedule (MPS)

The MPS must support the _____________ plan. - ANSWER sales and operations

_____________ determines the capacity necessary to produce the required
products now and in the future. - ANSWER resource planning

_____________ determines (explodes) the period-by-period (time phased) plans
for all component parts and raw materials required to produce all the products
in the MPS. - ANSWER Material requirements planning (MRP)

Detailed material planning can involve calculating requirements for thousands
of parts and components, using a formal logic called material requirements
planning (MRP). - ANSWER Material requirements planning (MRP)

______________ systems provide inputs to the financial, distribution, marketing,
and human resources systems that require the information. - ANSWER
Management production schedule (MPS)

____________ is one of MPC system approaches, in which time between
successive units is based on "seconds". - ANSWER flow

____________ is one of MPC system approaches, in which time between
successive units is based on "minutes". - ANSWER repetitive

____________ is one of MPC system approaches, in which time between
successive units is based on "days". - ANSWER just-in-time

____________ is one of MPC system approaches, in which time between
successive units is based on "weeks". - ANSWER MRP

____________ is one of MPC system approaches, in which time between
successive units is based on "months". - ANSWER project

In supply chain environments, the __________ system must coordinate the
planning and control efforts across all companies involved. - ANSWER MPC

The specific requirements for the _________ system design depend on the nature
of the production process, the degree of supply chain integration, customers'
expectations, and the needs of management. - ANSWER MPC

Geschreven voor

Instelling
OPSM 4820
Vak
OPSM 4820

Documentinformatie

Geüpload op
13 april 2026
Aantal pagina's
12
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$19.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Evergreenview Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
14
Lid sinds
1 jaar
Aantal volgers
1
Documenten
3122
Laatst verkocht
1 maand geleden

4.8

5 beoordelingen

5
4
4
1
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen