The engineering limits are the absolute threshold values
for individual test results. (T/F) - Answer-True
Quality assurance specifications typically use quality
measures. (T/F) - Answer-True
Since the objective of the IA comparison is to identify
discrepancies or variability in testing procedures or
equipment l, IA testing is performed on split samples. (T/F)
- Answer-True
Dispute resolution is a formal system designed to address
significant differences between agency acceptance test
data and/or observations and contractor QC test data
and/or observations. (T/F) - Answer-True
,2|Page
All agency central laboratories are required under federal
regulations to be accredited through the AASHTO
accreditation program (AAP). (T/F) - Answer-True
Personnel qualification/certification programs should
include requirements for recertification at 2 to 5 year
intervals. (T/F) - Answer-True
Each agency construction QA program must meet
requirements of 23 CFR 637B and is required to be
approved by FHWA. (T/F) - Answer-True
Asphalt binder exists in both naturally occurring and
manufactured forms. (T/F) - Answer-True
Quality assurance is defined only as those planned and
systematic actions taken by the agency to provide
confidence that a product or facility will perform
satisfactory in service. (T/F) - Answer-False
A quality assurance program serves as a skeleton or
overall framework necessary for construction quality
assurance implementation. (T/F) - Answer-True
, 3|Page
Joint development and review of quality assurance
specifications should include agency and industry
personnel (engineers, inspectors, technicians) who are
directly responsible for construction. (T/F) - Answer-True
The same six core elements required for a design-bid-
build constitution QA programs are also required for
design-build construction QA programs. (T/F) - Answer-
True
Quality control activities include only sampling and testing.
Visual inspection is regulated to the acceptance inspector.
(T/F) - Answer-False
Quality control plans are project specific documents
whose function is to address specific production facility
and field placement processes for individual categories of
work on a construction project. (T/F) - Answer-True
Acceptance is the responsibility of the transportation
agency. (T/F) - Answer-True
Another appropriate term for asphalt binder is tar. (T/F) -
Answer-False