What is OPNAV 4790/2L used for
Give this one a try later!
Amplifying information to a 4790/2K
SYSCOM MRC Number
Give this one a try later!
2 digit date code (month/year) 1-9 (Jan-Sep) A-C (Oct-Dec)
4 digit library control number
Parts Required
,What are the minimums for maintenance requirement/MRC
Give this one a try later!
Periodicity Codes
OPNAV 4790/2K
Give this one a try later!
Work Candidate
What instruction provides guidance to the surface force's 3M program
Give this one a try later!
COMNAVSURFPACINST 4790.1G
How would the Maintenance Person validate they have the most recent MRC?
Give this one a try later!
, MRC to MIP
MRC SYSCOM to MIP
MIP to LOEP
MIP SYSCOM to LOEP
LOEP to Change Page
LOEP FR to Change Page FR
Which block details a listing of those precautions and references, which direct
attention to hazards to personnel while doing maintenance
Give this one a try later!
Safety Precautions
All PMS-worthy equipment (individual equipment requiring maintenance) must be
identified as _____ _____ in SKED 3.2
Give this one a try later!
Maintenance Items
Who is the 3M Functional Manager
Give this one a try later!
3M Manager
Give this one a try later!
Amplifying information to a 4790/2K
SYSCOM MRC Number
Give this one a try later!
2 digit date code (month/year) 1-9 (Jan-Sep) A-C (Oct-Dec)
4 digit library control number
Parts Required
,What are the minimums for maintenance requirement/MRC
Give this one a try later!
Periodicity Codes
OPNAV 4790/2K
Give this one a try later!
Work Candidate
What instruction provides guidance to the surface force's 3M program
Give this one a try later!
COMNAVSURFPACINST 4790.1G
How would the Maintenance Person validate they have the most recent MRC?
Give this one a try later!
, MRC to MIP
MRC SYSCOM to MIP
MIP to LOEP
MIP SYSCOM to LOEP
LOEP to Change Page
LOEP FR to Change Page FR
Which block details a listing of those precautions and references, which direct
attention to hazards to personnel while doing maintenance
Give this one a try later!
Safety Precautions
All PMS-worthy equipment (individual equipment requiring maintenance) must be
identified as _____ _____ in SKED 3.2
Give this one a try later!
Maintenance Items
Who is the 3M Functional Manager
Give this one a try later!
3M Manager