IEM 4 Periodicities :
Give this one a try later!
(LU) Lay up- Start of layup period
(PM) Periodic Maintenance-during periods of inactivity minimum
maintenance may be required.
(SU) Start up- end the IEM period and brings equipment /systems back into
operation.
(OT) Operational Test -Once out of the IEM period provides overall system
operability.
What role does the 3MC play in the 3M system?
Give this one a try later!
, Functional Manager. Responsible for executing the duties of the 3M
program.
Repair Activity (RA) responsible for ?
Give this one a try later!
Responsible for contractors/civilians authorized to work on shipboard
systems. They do not tag-out systems, however they must verify:
1. Adequacy and accuracy of tags used to isolate the system ( sign TORS )
2. Tags were hung properly ( initial TORS and TAGS )
3. Work Is complete and tags may be removed (Sign TORS)
Explain the relationship between the following :
Give this one a try later!
1.LOEP and MIP- LOEP ID's all systems that must be maintained (PMS'd)
which will be listed on MIP.
2.Equipment Configurations and the LOEP
-Equipment Configurations are part of the OMMS-NG data base.
-Equipment Configurations are all the systems/equipment installed
onboard.
-Equipment Configurations are the items it took to build the ship.
-All Equipment or systems that must be maintained are listed on the LOEP.
3.LGL and MRCs -LGL's are part of MRC's and list all equipment associated
with MRC.
4.MIP and the MRC-MIP will be the system/equipment; MRCs are the
different maintenance requirements associated with the MIP.
5.Change Page and the LOEP- All changes made to the work center PMS
documentation will be logged. A point of reference must be sited for each
change.
, LOEP (List of Effective Pages) Provides :
Give this one a try later!
1. List of ALL SYSTEMS/EQUIPMENT for a particular work center.
2. If a new MIP is added the letter "A" will be placed in the first column.
3. If there is a change to the MIP during the last Force Revision the letter
"C" will be placed in the first column.
4. Approved FBR is required for LCPO to make one lines on the LOEP.
Out of commission label is?
Give this one a try later!
The instrument error is small and will not accurately indicate parameters.
what is the purpose of equipment tag-out procedures?
Give this one a try later!
1. Provide for personnel and ship safety and prevent damage of equipment
2. Electronically and mechanically isolate systems/equipment t to work on
safety
3. Provides a standard tag out procedure
Preventive maintenance (PMS):
Give this one a try later!
Give this one a try later!
(LU) Lay up- Start of layup period
(PM) Periodic Maintenance-during periods of inactivity minimum
maintenance may be required.
(SU) Start up- end the IEM period and brings equipment /systems back into
operation.
(OT) Operational Test -Once out of the IEM period provides overall system
operability.
What role does the 3MC play in the 3M system?
Give this one a try later!
, Functional Manager. Responsible for executing the duties of the 3M
program.
Repair Activity (RA) responsible for ?
Give this one a try later!
Responsible for contractors/civilians authorized to work on shipboard
systems. They do not tag-out systems, however they must verify:
1. Adequacy and accuracy of tags used to isolate the system ( sign TORS )
2. Tags were hung properly ( initial TORS and TAGS )
3. Work Is complete and tags may be removed (Sign TORS)
Explain the relationship between the following :
Give this one a try later!
1.LOEP and MIP- LOEP ID's all systems that must be maintained (PMS'd)
which will be listed on MIP.
2.Equipment Configurations and the LOEP
-Equipment Configurations are part of the OMMS-NG data base.
-Equipment Configurations are all the systems/equipment installed
onboard.
-Equipment Configurations are the items it took to build the ship.
-All Equipment or systems that must be maintained are listed on the LOEP.
3.LGL and MRCs -LGL's are part of MRC's and list all equipment associated
with MRC.
4.MIP and the MRC-MIP will be the system/equipment; MRCs are the
different maintenance requirements associated with the MIP.
5.Change Page and the LOEP- All changes made to the work center PMS
documentation will be logged. A point of reference must be sited for each
change.
, LOEP (List of Effective Pages) Provides :
Give this one a try later!
1. List of ALL SYSTEMS/EQUIPMENT for a particular work center.
2. If a new MIP is added the letter "A" will be placed in the first column.
3. If there is a change to the MIP during the last Force Revision the letter
"C" will be placed in the first column.
4. Approved FBR is required for LCPO to make one lines on the LOEP.
Out of commission label is?
Give this one a try later!
The instrument error is small and will not accurately indicate parameters.
what is the purpose of equipment tag-out procedures?
Give this one a try later!
1. Provide for personnel and ship safety and prevent damage of equipment
2. Electronically and mechanically isolate systems/equipment t to work on
safety
3. Provides a standard tag out procedure
Preventive maintenance (PMS):
Give this one a try later!