COMPLETE QUESTIONS AND ANSWERS
◉H1b is for a specialty occupation is one that requires the
application of a body of highly specialized knowledge and the
attainment of at least a bachelor's degree or its equivalent. Answer:
True
◉What claim is aligned to the contractor causing any damage to the
property while completing the project, the client may hold them
liable for this damage by filing a damage claim. If a subcontractor
causes damage, you might be responsible for the damage if they
don't have insurance coverage.. Answer: Damage Claim
◉Proper change order management enables teams to mitigate the
significant. Answer: True
◉According to estimates an average X% of projects experience at
least one major change throughout the project. Answer: 35%
◉The procurement plan must be aligned with your what two areas.
Select the two that are correct. Answer: Engineering design basis &
construction strategy
, ◉Research has identified 6 main causes of construction disputes.
Answer: true
◉which is not a typical type of construction claim?. Answer: Injury
Claims
◉If the owner influences unnecessary safety risk or doesn't provide
a safe work environment, they are liable for all safety incidents on
site.. Answer: True
◉Louisiana does not require employers to give terminated
employees Servance pay. If an employer does offer the benefit, it
does not have to comply with its own internal policies on a
severance package. Answer: False
◉EPC stands for engineering procurement and construction.
Answer: True
◉If errors and uncertainties in design are not rectified during the
design phase, they eventually appear in the construction phase.
Answer: True