Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CDFM Module 4 Exam questions with correct answers

Beoordeling
-
Verkocht
-
Pagina's
21
Cijfer
A+
Geüpload op
14-04-2026
Geschreven in
2025/2026

CDFM Module 4 Exam questions with correct answers CDFM Module 4 Exam questions with correct answers CDFM Module 4 Exam questions with correct answers CDFM Module 4 Exam questions with correct answers CDFM Module 4 Exam questions with correct answers CDFM Module 4 Exam questions with correct answers CDFM Module 4 Exam questions with correct answers

Meer zien Lees minder
Instelling
CDFM Module 4
Vak
CDFM Module 4

Voorbeeld van de inhoud

CDFM Module 4 Exam questions with
correct answers
What |are |Joint |Acquisition |Programs? |- |VERIFIED |ANSWER✔✔-Joint |Acquisition |Programs |is |any
|acqusition |system, |subsystem, |component, |or |technology |program |with |astrategy |that |includes

|funding |by |more |than |one |DoD |component |during |any |phase |of |a |system's |life |cycle.




Who |decides |to |place |programs |under |joint |acquisition |management? |- |VERIFIED |ANSWER✔✔-The
|MDA |decides |whether |to |place |programs |under |joint |management |and |designates |the |lead |executive

|DoD |component.




What |law |requires |an |analysis |of |potential |opportunities |of |international |cooperation? |- |VERIFIED
|ANSWER✔✔-10 |USC |2350a(e) |requires |international |cooperation |consideration |in |the |initial

|aquisition |strategy |for |a |program.




When |international |programs |may |be |established |in |the |defense |acqusition |program |- |VERIFIED
|ANSWER✔✔-Decision |to |include |international |partners |needs |to |be |included |during |development |of

|the |initial |capabilities |document |but |no |early |than |the |material |and |solution |analysis |phase.




When |is |Earned |Value |Management |(EVM) |implemented |- |VERIFIED |ANSWER✔✔-EVM |is |part |of
|program |management |. |It |ensures |that |cost |, |schedule |and |technical |aspects |of |the |contract |are |truly

|integrated.




In |what |type |of |contracts |EVM |is |required |- |VERIFIED |ANSWER✔✔-EVM |is |required |on |Cost, |and/or
|Incentive |contracts |valued |at |greater |than |$20M.




What |is |EVM? |- |VERIFIED |ANSWER✔✔-Earned |Value |Management |is |a |tool |that

1. |Relates |the |scope |of |the |work |to |its |associated |budgets |and |schedule.

2. |Measures |the |work |progress |in |objective |terms

3. |States |that |value |of |the |work |completed |in |dollars |and |other |measurable |units.

,What |are |EVM |techniques? |- |VERIFIED |ANSWER✔✔-Correlate |the |budgeted |cost |of |worked |scheduled
|with |the |budget |cost |of |work |performed |(BCWP)



1. |0/100 |Earned |Value |Technique

2. |Percent |Start/Percent |Finish |EV |Technique |(50/50) |(25/75) |(80/20)

3. |Percent |Complete

4. |Units |Completed

5. |Equivalent |Units



Describe |the |Percent |Start/Percent |Finish |EV |Technique |- |VERIFIED |ANSWER✔✔-Is |an |objective
|earned |value |technique |tied |to |the |start |and |completion |of |a |work |package |task, |often |referred |to |%

|assigned |to |the |start |and |finish |milestone |such |as |(50/50...)



Thsi |technique |tends |to |overstate |performance |in |the |first |half |of |the |period |of |performance |and
|uderstate |performance |in |the |last |half.




What |is |the |most |important |step |in |EVM |system? |- |VERIFIED |ANSWER✔✔-Is |the |establishment |of |the
|Performance |Measurement |Baseline |(PMB)or |the |Budgeted |Cost |of |Work |Schedule |(BCWS)




What |is |the |PMB |in |and |EVM? |- |VERIFIED |ANSWER✔✔-The |PMB |includes |the |undistributed |budget,
|all |summary |level |planning |package |budgets, |and |all |control |account |budgets. |It |does |not |include

|management |reserve.




What |is |the |final |step |of |the |PMB? |- |VERIFIED |ANSWER✔✔-Is |to |classify |work, |to |allocate |the |budget
|and |to |time |phase |the |control |account |work |package |budgets. |This |last |phase |is |calculate |BWCS




How |do |we |classify |work |packages |in |EVM? |- |VERIFIED |ANSWER✔✔-in |3 |categories, |Discrete,
|apportioned |effort, |and |level |of |effort.




Describe |the |realignment |of |the |PMB |- |VERIFIED |ANSWER✔✔-Rebaselining, |Replanning, |and
|Reprogramming




What |is |Reprogramming? |- |VERIFIED |ANSWER✔✔-Reprogramming |is |a |comprehensive |realignment |of
|the |remaining |performance |measurement |baseline |that |results |in |a |total |budget |and/or |total

, |schedule |that |exceeds |the |contractual |requirements. |It |is |the |process |that |results |in |an |Over-Target
|Baseline |or |OTB |and |an |Over-Target |Schedule |OTS.




Schedule |Performance |Index |(SPI) |formula |- |VERIFIED |ANSWER✔✔-SPI=BCWP/BCWS



Estimate |at |Completion |(EAC) |formula |- |VERIFIED |ANSWER✔✔-EAC=ACWP+[(BAC-
BCWP)/(Performance |Factor)]



EAC |Compsite |formula |- |VERIFIED |ANSWER✔✔-ACWPcum+[(BAC-BCWPcum)/(CPIcum*SPIcum)]

Upper |Value |(worst |case)



EVM |Terminology |- |VERIFIED |ANSWER✔✔-EAC=Estimate |at |Completion

BAC=Budget |at |Completion(current)

BCWS=Budget |Cost |of |Work |Scheduled |(current)

BWCP=Budget |Cost |of |Work |Performed |(earned |value)

ACWP=Actual |Cost |of |Work |Performed



What |is |the |Contractor |Cost |and |Software |Data |Reporting |(CSDR) |- |VERIFIED |ANSWER✔✔-The |CSDR
|system |involves |two |formal |contractor |reports, |the |COntractor |Cost |Data |Report |(CCDR) |and |the

|Software |Resources |Data |Report |(SRDR)




What |is |Contract |Performance |Report |(CPR) |- |VERIFIED |ANSWER✔✔-The |PM |should |obtain |from |the
|contractor |a |CPR |(DD |form |2734) |on |all |contracts |the |meet |or |exceed |EVMS |dollar |thresholds |and

|require |EVMS |compliance. |The |CPR |provides |contract |cost |and |schedule |performance |for |program

|mangement.




What |is |Contract |Funds |Status |Report |(CFSR) |- |VERIFIED |ANSWER✔✔-(DD |1586) |has |no |specific
|application |thresholds |but |PMs |should |evaluate |contracts |of |less |than |$1.3M. |FFP |contracts |should

|not |apply |the |CFSR |unless |unusual |circumnstances |dictate |funding |visibility.




What |is |Government |Contract |Quality |Assurance |(GCQA) |- |VERIFIED |ANSWER✔✔-DCMA |Q&A
|personnel |conducts |quality |assurance |as |identified |in |contract |administration |delegations |by |the |KO.

Geschreven voor

Instelling
CDFM Module 4
Vak
CDFM Module 4

Documentinformatie

Geüpload op
14 april 2026
Aantal pagina's
21
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

17.49 $
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Puresilver4 stuvia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
107
Lid sinds
1 jaar
Aantal volgers
1
Documenten
1581
Laatst verkocht
14 uur geleden
PASS SILVER

EXAMS practice with verified and correct answers pass grade A+ SILVER PASSI have Accounting, Finance, Statistics, Computer Science, Nursing, Chemistry, Biology And All Other Subjects A+ solutions A+ SOLUTIONS FOR FELLOW STUDENTS Nursing Being my main profession line, My mission is to be your LIGHT in the dark. If you're worried or having trouble in nursing school, I really want my notes to be your guide! I know they have helped countless others get through and that's all I want for YOU! I have essential Study guides that are Almost A+ graded, I am a very friendly person: Solutions SolutionsStuvia

Lees meer Lees minder
3.9

19 beoordelingen

5
9
4
1
3
8
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen