A+) - Murdoch University
Question 1
Correct
Mark 1 .00 out of 1 .00
A set of comprehensive guidelines for carrying out all of the activities of each core process of the SDLC is called a(n ):
Select one:
a. methodology
b. model
c. technique
d. iteration
The correct answer is: methodology
2
Correct
A(n ) includes hardware, software, inputs, outputs, data, people, and procedures.
Select one:
a. system
b. information system
c. subsystem
d. functional decomposition
The correct answer is:
information system
, Get the mobile
Questionapp
3
Incorrect
Mark 0.00 out of 1 .00
Determining the major subsystems and assigning them to an iteration is done in which Core Process?
Select one:
a. 1. Identify the problem and obtain approval
b. 2. Plan and monitor the project
c. 3. Discover and understand details
d. 4. Design system components
e. 5. Build, test and integrate system components
f. 6. Complete system tests and deploy the solution.
The correct answer is:
2. Plan and monitor the project
Question 4
Correct
Mark 1 .00 out of 1 .00
The process of understanding and specifying in detail what the information system should accomplish is called systems .
Select one:
a. design
b. specification
c. analysis
d. administration
The correct answer is:
analysis