1. What is the primary purpose of a pre-demolition survey?
A. To estimate labor costs
B. To identify structural hazards and materials
C. To determine demolition speed
D. To select demolition equipment
Answer: B
Rationale: A pre-demolition survey assesses the structure,
identifies hazards such as asbestos or unstable elements, and
ensures proper planning for safety and compliance.
2. Which material is most commonly associated with hazardous
demolition conditions?
A. Wood
B. Concrete
C. Asbestos
, D. Brick
Answer: C
Rationale: Asbestos is a hazardous material that poses serious
health risks and requires specialized handling during demolition.
3. What is the first step in a demolition project?
A. Structural collapse
B. Equipment selection
C. Site clearance
D. Planning and permitting
Answer: D
Rationale: Proper planning and obtaining permits ensures
compliance with regulations and safe execution of the
demolition process.
4. Which piece of equipment is commonly used for high-reach
demolition?
A. Bulldozer
B. Crane with wrecking ball
C. High-reach excavator
D. Backhoe
Answer: C
, Rationale: High-reach excavators are specifically designed to
safely dismantle tall structures from a distance.
5. What is the main hazard of uncontrolled structural collapse?
A. Noise pollution
B. Dust accumulation
C. Injury or fatality
D. Equipment damage
Answer: C
Rationale: Uncontrolled collapse can lead to severe injuries or
fatalities for workers and nearby individuals.
6. Which PPE is essential when working in demolition sites?
A. Sunglasses
B. Hard hat
C. Sandals
D. Jewelry
Answer: B
Rationale: Hard hats protect workers from falling debris, which is
a major hazard in demolition.
7. What type of demolition involves dismantling a structure piece by
piece?
A. Implosion
, B. Mechanical demolition
C. Deconstruction
D. Explosive demolition
Answer: C
Rationale: Deconstruction focuses on carefully taking apart
structures to salvage materials and minimize waste.
8. What is the purpose of dust suppression during demolition?
A. Improve visibility only
B. Reduce noise
C. Protect worker health and environment
D. Speed up demolition
Answer: C
Rationale: Dust suppression prevents respiratory hazards and
environmental contamination.
9. Which method uses explosives to bring down structures?
A. Manual demolition
B. Mechanical demolition
C. Implosion
D. Deconstruction
Answer: C