QUESTIONS AND CORRECT ANSWERS
GUARANTEED PASS
◉during elevator install you need to rig equipment to the top of the
building. what info must be included in the lift plan?. Answer:
capacity of rigging material
◉the crane operator is awaiting you signals to lift a pallet of parts.
what are the correct audible signals to raise the load 20 feet?.
Answer: hoist, hoist up, 20,15,10,1, hoist stop
◉you are storing fiber core wire rope slings. what could cause
damage to the core material?. Answer: solvents
◉you are selecting a wire rope sling to rig 1000lbs. what safety
factor does asme require?. Answer: 5:1
◉there could be unapparent wear in the slings you must use for
hoisting. what sling rating take this into account?. Answer: rated
load
, ◉where is the best place to store natural fiber hoisting rope.
Answer: open sided crate
◉you have installed a power winch at the first floor preparing to
hoist equipment. the hoist rope passes over a single sheave on the
hoist beam making a direct pick. what is the downward force that a
3000lb load will exert on the overhead hoist beam?. Answer: 6k lbs
◉you are preparing to use a chainfall to lift a load up a hoistway.
what safety equipment is required on each of the two hooks on the
chain fall?. Answer: tags
◉who can give the command to stop a hoist?. Answer: anyone
◉which safety feature protects against getting caught under a
counterweight?. Answer: counterweight guard
◉you are installing a 250 fpm freight elevator. what type of buffers
should you use?. Answer: oil buffers
◉you are working in a pit deeper than normal. what can you do to
bring the buffers up to the proper height?. Answer: buffer stands