⩥ A Designated Employee should be? Answer: At least 18, Full Time,
Passed Required Exams
⩥ What is the initial Recovery Fund fee? Answer: $25
⩥ If a contractor earns more than $_______ per year, then the contractor
is required to have a Class A. Answer: $750,000
⩥ If a contract awards more than $_________ per payment, the
contractor is required to have a Class A. Answer: $120,000
⩥ An Erosion control conservation plan needs to be approved within
____ days. Answer: 60 Days
⩥ Where do you go to file an appeal of a violation to the USBC
provisions? Answer: to The LBBCA
Local
Board of
,Building
Code
Appeals
⩥ A contractor is required to submit a renewal within____ days of the
expiration date? Answer: 30
⩥ Who can file a complaint against a contractor? (under the recovery
fund) Answer: Residential Property Owner
⩥ What is required when changing the from of entity from a sole
proprietorship to a corporation Answer: A new license
⩥ What is the maximum fund allowed for a single contractor? (per
biennium) Answer: $40,000
⩥ To whom should a stop work order be given? Answer: owner, owner's
agent or the person doing the work
⩥ Within how many days should be submitted an appeal for
construction? Answer: 30 Days
,⩥ An appeal of the local building officials decision to refuse to grant a
modification to the USBC MUST be made within how many days?
Answer: 30 Days
⩥ Documents related to a contract should be kept for ______ years?
Answer: 5
⩥ Where should one set of all approved building documents be kept?
Answer: At the building site
⩥ An erosion control conservation specification needs to be approved
within_____ days Answer: 45 days
⩥ After notification by the code official, an application for a permit shall
be considered to have been abandoned for _____ months Answer: 6
⩥ Where is the Recovery Fund used? Answer: to pay claimants subject
to improper or dishonest conduct of a regulant
⩥ Disturbed land areas of less than ______ sq ft in size may not be an
issue of sediment and erosion control. Answer: 10,000
⩥ A designated employee must work a minimum of how many hours for
a licensed contracting business? Answer: 30 hours
, ⩥ The Board can refuse to renew a license when the principal owner is a
former owner or officer of a firm that______ Answer: Had its contractor
licensee revoked
⩥ what is the maximum amount a single contractor's Transaction
Recovery Fund claim against a licensee can be? Answer: $40,000
⩥ A license was issued on 10/15/2021. The expiration date is? Answer:
10/31/2023
⩥ What is the maximum amount that can be paid out on behalf of a
single contractor? Answer: $40,000
⩥ A code official can begin legal proceedings against a contractor with a
minimum of how many violations within one calendar year for work
without a permit: Answer: Three
⩥ Where must a building permit be posted? Answer: at the building site
⩥ A new building may be used after ______________ is issued. Answer:
Certificate of occupancy