How acceptance criteria are used? - ANSWER -Acceptance
criteria drive quality
-BAs capture them during requirements
gathering
-Developers use them to configure and code
requirements
-Testers use them to define test cases and derive
pass/fail status
-Product Owners use them to confirm if a user story can
be accepted
What are the 3 components of a user story? - ANSWER -A role,
an action, and
a
reason
What does it mean to elaborate a story? - ANSWER -Convos
occur between
the users and the team to ensure all requirements are
understood
,Layers of Planning - ANSWER -Program > Project > Release >
Iteration > Daily
Scrum
What does Ms. Cow stand for? - ANSWER -M-
Must have
S- Should
Have
Co- Could
Have
W- Will Not Have (for
now)
How are Themes broken down? - ANSWER -Themes >
Features/Subthemes >
User stories >
Tasks
When is a high-level sprint plan developed? - ANSWER -At the
end of inception
How are User Stories grouped? - ANSWER -By Theme and
Feature
Accelerators - ANSWER -pre-built code or reference
implementations to help
reduce developer
work
,What is the best practice for project planning? - ANSWER -
Plan for what you
know and then re-evaluate your plan
as needed
What does Guidewire provide as a starting point for your
project? - ANSWER GW provides approx. 5000 reusable
assets/tools to facilitate progress during the implementation
project
What are the goals for inception? - ANSWER -Confirm Scope,
Validate Sizing,
Baseline the
Project
What are some objectives for inception? - ANSWER --Formally
kick off the project
-Train the team on base product and methodology
-Introduce the team to agile concepts
-Determine an approach to address any product gaps
-Document the high-level design (HLD) for integrations
-Explain estimation changes as a result of the workshops
What are the 3 activity groupings? and how long should they
last? - ANSWER --
Overview and Kickoff (1-2
weeks)
-User Story Elaboration (2-10
weeks)
, -Sizing and Planning (1-5
weeks)
Elaboration sessions - ANSWER -The objective of elaboration
sessions during
Inception is to identify gaps and refine estimates; not
intended to flesh out
detailed
requirements
What does GW mean by Inception? - ANSWER -An phase to
confirm the scope
of the project , produce an initial sizing, and create the
project baseline
Who typically attends Inception? - ANSWER -Product
owners, SME, BAs,
developers, and
testers
Why does GW timebox Inception? - ANSWER -To avoid
collecting excessive
details
What are the steps to plan a delivery sprint? - ANSWER -1.
Determine team capacity
2. Define Sprint Backlog
3. Validate estimate for each user story
4. Define tasks for each user story in the sprint