Estimating - correct answer ✔prediction of probable costs and a given amount of time
Design Bid Build - correct answer ✔100% complete set of drawings prior to GC
Owner--> A/E
--> GC --> Subs
Division 01 - correct answer ✔General Requirements
Divisions 02 - correct answer ✔Site Construction
Divisions 03 - correct answer ✔Concrete
Divisions 04 - correct answer ✔Masonry
Divisions 05 - correct answer ✔Metals
Divisions 06 - correct answer ✔Woods, Plastics and Composites
Divisions 07 - correct answer ✔Thermal and Moisture Protection
Divisions 08 - correct answer ✔Openings
, Divisions 09 - correct answer ✔Finishes
Division 10 - correct answer ✔Specialties
Divisions 11 - correct answer ✔Equipment
Division 12 - correct answer ✔Furnishings
Divisions 13 - correct answer ✔Special Construction
Divisions 14 - correct answer ✔Conveying Equipment
Divisions 15 - correct answer ✔Mechanical
Divisions 16 - correct answer ✔Electrical
Design Build - correct answer ✔Single firm responsible for both design and construction
O--> Design Builder --- Subs
Design Build Advantages - correct answer ✔- Single point risk allocation
- Owner only has to communicate with one entity for the entire project
- Fast tracking
Integration of construction planning and design phases
- Reduce change orders