Con 353 LSQ Question and answers rated A+ 2025/2026
1. The max capacity of a crane is: The capacity 5' from the center pin
2. To stock material on a three Identify a material stocking access point
story building this would be the
appropri-ate method:
3. If the soil on your site wasn't able
to support the bearing pressure of Crane Matts
a crawler crane this would be the
solu-tion:
4. Flashing for openings should be
arranged in such a way that
wa-ter cannot make its way Sill, Jamb, Header
behind the
drainage barrier. If you were
flashing a window opening what
would be the proper order of
placing the flashing.
5. What type of underlayment would be Ice and water shield
used on a pitched roof at
locations that are susceptible to
standing snow or water such as a
chimney obstruc-tion?
6. Prior to the roofing contractor Mechanical Penetrations & Curbs, Electrical
start-ing work the following
activities should be complete: Penetra-tions, Plumbing penetrations.
7. If a roofing contractor was utilizing
a 6' warning line for their fall They are working outside of the 6' warning
protection system, they are
line.
required to be tied off when?
1/
5
, Con 353 LSQ
Where should the secondary Must discharge in a location that is visible to
over-flow drain discharge on a
flat roof? main-tenance personnel.
8. When would wire pull start on After dry in is complete
the building?
9. The rough electrical
inspection should take Prior to the framing inspection
place.
10. Who typically provides the Electrical contractor
raceway's such as cable tray's for
the projects low voltage systems?
11. Roof curbs for the project should
be set. Prior to the roof installation
12. The DWV underslab rough in
should be inspected.
Prior to backfill with a pressure test.
13. The rough plumbing inspection
for the drainage waste & vent
system shall be tested by: The portion under test shall be maintained
at a gauge pressure of 5 pounds per square
inch (psi) for 15 minutes.
14. The inspection for the Fire service line Pressure test at 200 PSI
includes:
15. When sequencing site utilities deepest to shallow
the typical order would be
from:
16. Prior to the slab on deck pour the Set hangers and sleeves
following should happen from a
MEP perspective.
17. prior to framing
2/
5
1. The max capacity of a crane is: The capacity 5' from the center pin
2. To stock material on a three Identify a material stocking access point
story building this would be the
appropri-ate method:
3. If the soil on your site wasn't able
to support the bearing pressure of Crane Matts
a crawler crane this would be the
solu-tion:
4. Flashing for openings should be
arranged in such a way that
wa-ter cannot make its way Sill, Jamb, Header
behind the
drainage barrier. If you were
flashing a window opening what
would be the proper order of
placing the flashing.
5. What type of underlayment would be Ice and water shield
used on a pitched roof at
locations that are susceptible to
standing snow or water such as a
chimney obstruc-tion?
6. Prior to the roofing contractor Mechanical Penetrations & Curbs, Electrical
start-ing work the following
activities should be complete: Penetra-tions, Plumbing penetrations.
7. If a roofing contractor was utilizing
a 6' warning line for their fall They are working outside of the 6' warning
protection system, they are
line.
required to be tied off when?
1/
5
, Con 353 LSQ
Where should the secondary Must discharge in a location that is visible to
over-flow drain discharge on a
flat roof? main-tenance personnel.
8. When would wire pull start on After dry in is complete
the building?
9. The rough electrical
inspection should take Prior to the framing inspection
place.
10. Who typically provides the Electrical contractor
raceway's such as cable tray's for
the projects low voltage systems?
11. Roof curbs for the project should
be set. Prior to the roof installation
12. The DWV underslab rough in
should be inspected.
Prior to backfill with a pressure test.
13. The rough plumbing inspection
for the drainage waste & vent
system shall be tested by: The portion under test shall be maintained
at a gauge pressure of 5 pounds per square
inch (psi) for 15 minutes.
14. The inspection for the Fire service line Pressure test at 200 PSI
includes:
15. When sequencing site utilities deepest to shallow
the typical order would be
from:
16. Prior to the slab on deck pour the Set hangers and sleeves
following should happen from a
MEP perspective.
17. prior to framing
2/
5