Asbestos Supervisor Initial Certification Exam
2026/2027 | EPA / State-Approved Program | Verified
Questions & Answers | 100% Correct
Q: A cable company arrives to install computer cables above a drop ceiling with known ACM
fireproofing debris on top of the tiles. Which of the following is true (if no contractor assist is
conducted)?
a.) Final clearance would be required by ADHERA after the job in a high school.
b.) Cable company would have to be Class III trained according to Cal-OSHA
c.) Cable contractor has to be told of the quantity of fireproofing above the ceiling
d.) B and c
Answer
D.) B and c
Q: Which of the jobs is a Class II job?
I. Removal of 80 sq. Ft. Of friable ACM acoustical ceiling tiles
II Cleanup of a spill of 20 sq. Ft. Of fallen and scattered friable ACM acoustical tiles
III. Demolition of a building with dry wall and taping mud remaining in place using a bulldozer
(Composite analysis of dry wall/taping mud is 0.8%)
IV. Removal of ACM floor tiles using a mechanical chipper (200 sq. Ft.)
V. Installation of a window frame (4'x4') in a wall with a 3% asbestos skim coat.
,https://www.stuvia.com/user/quizbit07
VI. Encapsulation of an ACM acoustical ceiling plaster (400 sq. Ft.)
Answer
I, II, III, IV
Q: Which of the jobs would require final clearance according to AHERA?
I. Removal of 80 sq. Ft. Of friable ACM acoustical ceiling tiles
II Cleanup of a spill of 20 sq. Ft. Of fallen and scattered friable ACM acoustical tiles
III. Demolition of a building with dry wall and taping mud remaining in place using a bulldozer
(Composite analysis of dry wall/taping mud is 0.8%)
IV. Removal of ACM floor tiles using a mechanical chipper (200 sq. Ft.)
V. Installation of a window frame (4'x4') in a wall with a 3% asbestos skim coat.
VI. Encapsulation of an ACM acoustical ceiling plaster (400 sq. Ft.)
Answer
I, II IV, VI
, https://www.stuvia.com/user/quizbit07
Q: Which of the jobs would require EPA accredited workers with a 4-day course to conduct
the job?
I. Removal of 80 sq. Ft. Of friable ACM acoustical ceiling tiles
II Cleanup of a spill of 20 sq. Ft. Of fallen and scattered friable ACM acoustical tiles
III. Demolition of a building with dry wall and taping mud remaining in place using a bulldozer
(Composite analysis of dry wall/taping mud is 0.8%)
IV. Removal of ACM floor tiles using a mechanical chipper (200 sq. Ft.)
V. Installation of a window frame (4'x4') in a wall with a 3% asbestos skim coat.
VI. Encapsulation of an ACM acoustical ceiling plaster (400 sq. Ft.)
Answer
I, II, III, IV, VI (ALL class 1 and 2 jobs)
Q: Which of the jobs would require a DOSH registered asbestos contractor/employer?
I. Removal of 80 sq. Ft. Of friable ACM acoustical ceiling tiles
II Cleanup of a spill of 20 sq. Ft. Of fallen and scattered friable ACM acoustical tiles
III. Demolition of a building with dry wall and taping mud remaining in place using a bulldozer
(Composite analysis of dry wall/taping mud is 0.8%)
IV. Removal of ACM floor tiles using a mechanical chipper (200 sq. Ft.)