What happens to your CR when you sell your business? - Correct Answer -Non transferable if
partial sale then have CR revised
True or False you can install a nursing home with a CR? - Correct Answer -True with proper RME
employed
How long does a RME have to let SFM they changed companies? - Correct Answer -14 days
How long do you have to let a SFM about a yellow tag? - Correct Answer -5 days
NFPA 20 - Correct Answer -Standard for the Installation of Stationary Pumps for Fire Protection
NFPA 16 - Correct Answer -Standard for the Installation of Foam-Water Sprinkler and Foam-
Water Spray Systems
, NFPA 15 - Correct Answer -Standard for Water Spray Fixed Systems for Fire Protection
NFPA 14 - Correct Answer -Standard for the Installation of Standpipe and Hose Systems
NFPA 13 R - Correct Answer -Standard for the installation of low rise/residential occupancies
NFPA 13 D - Correct Answer -Standard for the installation of sprinkler systems in one and two
family dwellings and manufactured homes
NFPA 25 - Correct Answer -Standard for the Inspection, Testing, and Maintenance of Water-
Based Fire Protection Systems
NFPA 13 - Correct Answer -Standard for the Installation of Sprinkler Systems
Full time basis - Correct Answer -When you work the same number of hours as all other
employees