UPDATED ACTUAL QUESTIONS AND
CORRECT ANSWERS
In order to obtain NOI coverage under the IGP, PRDs include: - CORRECT ANSWER NOI and
electronic certification by the LRP
Permit registration fee
Site Map
SWPPP
If the discharger must redact information in order to comply with federal law that addresses security
in the US, the discharger must also submit - CORRECT ANSWER A written justification that
the information redaction is necessary to comply with federal law
What are three reasons for a discharger submitting an NOT in SMARTs? - CORRECT
ANSWER -the facilities' industrial operations have changed and are no longer subject to the
IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities, and removed all industrial related
pollutants
A person in which position would be eligible to be an LRP: Maintenance supervisor, QISP consultant,
Public works director, or Monitoring consultant? - CORRECT ANSWER Public works director
The temporary suspension of industrial activities requires what to be uploaded in SMARTS? -
CORRECT ANSWER -The justification for why the monitoring is infeasible at the facility
during the temporary suspension
-The projected date that the industrial activities will resume at the facility
-SWPPP revisions specifically addresses the facility stabilization BMPs
-The date the facility is fully stabilized for temporary suspension of industrial activities
Authorized NSWDs include which of the following: discharges from a broken water main in an
employee parking lot; fire hydrant testing; rinse water from industrial equipment washing, BMPs are
, deployed as needed; water from landscape irrigation that runs through the facility's stockpiled
materials? - CORRECT ANSWER Fire Hydrant Testing
Name four things required to be in the SWPPP? - CORRECT ANSWER -Storm Water
Pollution Prevention Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility site map: a restroom's municipal
sanitary sewer connection; structural control measures; analytical sampling values from the previous
reporting year; each BMP implemented at the facility; spills and leaks over 42 gallons from the
previous 6 year period? - CORRECT ANSWER Structural control measures
A discharger that has fulfilled the requirements for the temporary suspension of industrial activities at
a facility is not required to... - CORRECT ANSWER Perform sampling and analysis of storm
water discharges because the discharger has justified that it is infeasible to do so
Water Quality Based Corrective Actions can be required by which agency? - CORRECT
ANSWER Regional Water Board
The IGP does not require training for the: - CORRECT ANSWER LRP (Legally Responsible
Person)
What is the expiration date of the IGP? - CORRECT ANSWER June 30, 2020 or the effective
date of a new IGP
If the discharger's industrial storm water discharges and/or authorized NSWDs contain pollutants that
cause violations of Receiving Water Limitations, what must the discharger implement? - CORRECT
ANSWER Any additional BMPs or SWPPP implementation measures as necessary to reduce or
prevent pollutants in industrial storm water discharges to meet the Receiving Water Limitations.
The sum of the allowable contributions of a single pollutant to a water body from all anthropogenic
sources plus the contribution from background sources is which of the following? - CORRECT
ANSWER TMDL (Total Maximum Daily Load)