SAFE AGILE SCRUM MASTER STUDY
GUIDE. EXAM QUESTIONS AND
ANSWERS 100% PASS.
ART - ANS Agile Release Train
PO - ANS Project Owner
PI - ANS Program Increment
Innovation and Planning Iteration - ANS Occurs every PI and serves multiple purposes. It acts
as an estimating buffer for meeting PI objectives, as well as providing dedicated time for
innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events.
Inspect & Adapt (I&A) - ANS A significant event, held at the end of each PI, where the current
state of the solution is demonstrated and evaluated by the train. Teams reflect and identify
improvement backlog items via a structured, problem-solving workshop
Iteration - ANS A basic building block of Agile development. Each is a standard, fixed-length
timebox, where Agile Teams deliver incremental value in the form of working, tested software
and systems.
What is the recommended timebox duration for an Iteration? - ANS 2 weeks; however, 1-4
weeks is acceptable, depending on the business context.
2026 STUDY MATERIAL @COPYRIGHT RESERVED 1
, Who participates in the Inspect & Adapt (I&A) phase? - ANS All stakeholders, including:
1. The Agile Teams
2. Release Train Engineer (RTE)
3. System and Solution Architect Engineering
4. Product Management, Business Owners, and others on the Train
What results from the I&A phase? - ANS Improvement backlog items that go to the Program
Backlog for the next PI Planning event
3 parts of I&A - ANS PI System Demo
Quantitative Measurement
Retrospective and Problem-Solving Workshop
Purpose of PI System Demo - ANS To show all the Features the ART has developed over the
course of the PI
PI System Demo Timebox - ANS ~1 hr or less
What is one primary measurement to be considered in quantitative metrics? - ANS Program
predictability measure
Retrospective goal - ANS To identify whatever issues they would like to address
Retrospective objective - ANS To identify a few significant problems that the teams can
potentially address
PDCA Cycle - ANS Plan
Do
Check
2026 STUDY MATERIAL @COPYRIGHT RESERVED 2
GUIDE. EXAM QUESTIONS AND
ANSWERS 100% PASS.
ART - ANS Agile Release Train
PO - ANS Project Owner
PI - ANS Program Increment
Innovation and Planning Iteration - ANS Occurs every PI and serves multiple purposes. It acts
as an estimating buffer for meeting PI objectives, as well as providing dedicated time for
innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events.
Inspect & Adapt (I&A) - ANS A significant event, held at the end of each PI, where the current
state of the solution is demonstrated and evaluated by the train. Teams reflect and identify
improvement backlog items via a structured, problem-solving workshop
Iteration - ANS A basic building block of Agile development. Each is a standard, fixed-length
timebox, where Agile Teams deliver incremental value in the form of working, tested software
and systems.
What is the recommended timebox duration for an Iteration? - ANS 2 weeks; however, 1-4
weeks is acceptable, depending on the business context.
2026 STUDY MATERIAL @COPYRIGHT RESERVED 1
, Who participates in the Inspect & Adapt (I&A) phase? - ANS All stakeholders, including:
1. The Agile Teams
2. Release Train Engineer (RTE)
3. System and Solution Architect Engineering
4. Product Management, Business Owners, and others on the Train
What results from the I&A phase? - ANS Improvement backlog items that go to the Program
Backlog for the next PI Planning event
3 parts of I&A - ANS PI System Demo
Quantitative Measurement
Retrospective and Problem-Solving Workshop
Purpose of PI System Demo - ANS To show all the Features the ART has developed over the
course of the PI
PI System Demo Timebox - ANS ~1 hr or less
What is one primary measurement to be considered in quantitative metrics? - ANS Program
predictability measure
Retrospective goal - ANS To identify whatever issues they would like to address
Retrospective objective - ANS To identify a few significant problems that the teams can
potentially address
PDCA Cycle - ANS Plan
Do
Check