A quantity surveyor should be called upon in the early stages of consultation by the
client. - ANSWER-True
The Builder's expertise in Building production management is the main
professional input that he renders on building projects. - ANSWER-True
At site level, the builder will be the most senior construction team member for the
contractor. - ANSWER-True
The Builder's role in building development process starts from the ____________
stage but takes prominence at the__________ - ANSWER-design/construction
Some information in the drawings can only be found on one view and not the
others. - ANSWER-True
features that should be read first are drawn with more prominent lines. -
ANSWER-True
The designations of all the rooms for example bedroom, bathroom, and kitchen can
be found on sectional view. - ANSWER-False
When revisions are made, the designer generally is just going to reissue the page
that contains those revisions and not necessarily every page in the set. - ANSWER-
True
1
,Changes to the original design can only be affected by the owner via the builder. -
ANSWER-False
...................... refers to thickness, and difference in it helps to interpret the
drawings more easily. - ANSWER-Line Weight
In which part of the drawing are you going to find general information about both
the project and the information that is contained on the drawing sheet in? -
ANSWER-Tittle Block
...............................define a physical item's outline. - ANSWER-Visible Object
Lines
What does "EO" stand for? - ANSWER-Electrical Outlet
What does "CTF" stand for? - ANSWER-Ceramic Tile Flooring
What does "VB" stand for? - ANSWER-Vinyl Base
Which option shows the correct description for A-B-C respectively? - ANSWER-
Production data area- Tittle block area- Note block
The increased use of computer aided drafting (CAD) has increased the need for
abbreviations. - ANSWER-False
The Symbols Module is suitable for manual drafting and CAD creators and those
that use construction documents. - ANSWER-True
2
, The information located on the code summary sheets should include only general
conceptual information. - ANSWER-True
The size and complexity of the project may dictate the placement of the regulatory
information. - ANSWER-True
An enlarged section detail can have different orientation from the wall section or
building section from which it is derived. - ANSWER-False
Select the location of CAD drawing file number in Tittle Block Area. - ANSWER-
Management Block
............................. is an arrangement of construction information based on physical
parts of a facility called systems and assemblies. - ANSWER-Uniformat
According to schedule modules, which option contains subject titles that define
specific information required for each line item listed in the schedule. - ANSWER-
Column Identifier
.......................... graphically indicate a word or words that may be used in notations
on drawings. (Two words answer) - ANSWER-Text Symbols
When an architect submits a set of construction drawings to the building
department, the architects responsibility is usually over. - ANSWER-False
Architects make site visits to observe the progress and quality of construction and
notify the owner when problems arise. - ANSWER-True