Latest 500+ Questions and Correct Answers /
High Pressure Steam NYC Exam Prep Test Bank
1 What shall a Design plan of a boiler and application contain but not limited to? -
ANSWER-Size + Location, Operating Pressure + Temperature of the Pressure
vessel, and Type + Specification of Pressure Relief.
2 When is a fusible plug not needed to be installed on a boiler? - ANSWER-Over
200 PSIG. HP Code: 14-10.17, b
3 When shall a power boiler with a MAWP over 400 be tested? - ANSWER-
Pressure tested annually ( safety valve). HP Code: 14-9.7, a,2
4 Who oversees the code for any plumbing installations? - ANSWER-The NYC
Plumbing Code NYC Mech: 1002.1
5 How is the Main Steam pressure gauges tested? - ANSWER-With an Inspectors
Gage. HP Code: 14-9.21, 14-10.19/NYC Mech:1011.2
6 How often are high pressure piping expansion joints inspected? - ANSWER-
Weekly RCNY: 20-02 a.2.i (HP steam piping). NYC Mech: 1210.3.1 (hydronics -
monthly)
7 How long should a Hydronic System be pressure tested for? - ANSWER-2 hours
at no less than 100 PSIG. NYC Mech: 1208.1
1
,8 How is a gauge protected from excessive pressure? - ANSWER-Shut off Cock
RCNY: 20-03 c,7
9 Who is authorized in witnessing a test on a gas piping system? - ANSWER-
Plumbing Inspector, Architect, Licensed PE, Master Plumber, or Agency by the
D.O.B RCNY 20-01 a,1,2
10 How should a remote disconnect be labeled? - ANSWER-Remote control for
burner. NYC Mech: 1006.8.1
11 When will anchorage or guides be inspected? - ANSWER-Annually. NYC
Mech: 1210.3.1.2
12 How many brass washout plugs does a miniature boiler have? - ANSWER-Not
less than 3 Brass Washout Plugs 1 inches in size. HP Code 14-11.5
13 The maximum blow down for a safety valve on a forced flow steam generator
or high temperature water boiler shall be of what percent of the set pressure? -
ANSWER-10%. HP Code: 14-9.12
14 Who is responsible for maintaining the copies of the certified welder
qualifications report? - ANSWER-Copies of the certified welder qualification
report she'll be maintained by the responsible WELDING AGENCY and the
company performing the welding, and shall be made available upon request to the
DOB. RCNY: 20-02, b,2v,/22-01,d,5. HP Code: 14-3.7
15 Who needs to furnish a control diagram and boiler operation instructions? -
ANSWER-The Installer. NYC Mech: 1004.7
2
,16 Who will certify and calibrate all gauges utilized for testing? - ANSWER-All
gauges utilized for testing shall be calibrated and certified annually in accordance
with ASME B40.100 by the test operator. NYC Mech: 1011.2
17 What shall be placed in between different joints and piping material? -
ANSWER-An approved Adapter Fitting NYC Mech: 1203.1.2
18 What items are exempt from the reporting requirements? - ANSWER-
Exemptions: (1) the installation of backing rings in handhole or manhole openings
or the building up of same; and (2) the seal welding of tubes to the tube sheet. HP
Code: 14-3.4, b, 1-2
19. Who will be under control for any welding done to a High-pressure tank? -
ANSWER-The welding shall be under controlled inspection of an ENGINEER,
supervising a welding inspection agency acceptable to the DOB RCNY: 22-01 d,2
20 At what pressure is it required to have extra heavy valves installed? -
ANSWER-HP Code: 14-10.21b / 14-9.2,b
21 The -------------- files an application for a boiler alteration - ANSWER-
Inspector HP Code: 14-3.3 c, 2, ii
22 How many safety valves does a boiler have with over 500 square feet of heating
surface? - ANSWER-At least 2 HP Code: 14-9.4a
23 Gas fired Boilers not exceeding 100 square feet of heating surface shall de
provided with a ? - ANSWER-Single or Double Cone type of Hood Diverter in the
stack HP Code: 14-6.2
3
, 24 A heater for either liquid fuels or other liquids harmful to the boiler shall not be
installed? - ANSWER-Directly in the steam or water space within a boiler. HP
Code: 14-5.1
25 Who is responsible for any spatial relationship between tanks and gas services?
- ANSWER-The Installer of the last installation to correct the violation. RCNY:
22-01, c,3
Who is responsible for the setting of operating and safety controls? - ANSWER-
The Installing Company NYC Mech: 1004.7
27 With what safety fitting shall you protect High Pressure Steam and Water
boilers with? - ANSWER-DUAL Low Water Cut Outs. NYC Mech: 1007.1. HP
Code: 14- 1. 14, a
28 Spring loaded safety valves have a total combined relieve capacity of? -
ANSWER-100% of the Max Designed Capacity of the Boiler. HP Code: 14-9.5, b
29 What is the total combined relieving capacity of power actuated relieving
valves? - ANSWER-NO LESS THAN 10% of the MAWP or NO HIGHER
THAN 20% ABOVE the MAWP. HP Code: 14-9.5, a, b
30 What is the minimum blowdown for a spring-loaded safety valve? - ANSWER-
2%. HP Code: 14-9.12
31 When a boiler is de-rated what changes? - ANSWER-The MAWP Decreases
and the BTU Output. HP Code: 14-3.21, a
4