Study Questions with 100% Correct
Answers
1. The only way to create an Xactimate estimate is through XactAnalysis. -
ANSWER False
2. With an Internet connection, you can download and upload a XactAnalysis
assignment. - ANSWER True
3. You can use the Missing Wall tool to delete a wall. - ANSWER True
4. Changing the room dimensions is the same thing as changing the room
shape - ANSWER False
5. What color must the measurement be to click on it and type it in? -
ANSWER Blue
6. When typing in a foot and inch measurement, a comma can be used to
separate the two numbers, i.e., 5,6. - ANSWER True
7. The ability to deduct for an opening (door, window, missing wall) can be
found where? - ANSWER Properties Window
8. Before dragging a wall handle, holding down the ______ key on your
keyboard will create a new room. - ANSWER Control
, 9. What does a number in parentheses represent when it follows a room name?
e.g., Closet (1) - ANSWER Subgroup
10.The Undo button can only be used twice. - ANSWER False
11.The variable PF stands for floor perimeter. - ANSWER True
12.This Quick Entry field represents a two-letter code for each item quantity.
For example, SF (square feet), EA (each), UN (unit), etc. - ANSWER
Unites of Measure
13.Which Quick Entry field determines the item's unit price by describing
exactly what is to happen to that specified item? - ANSWER Item Activity
(Act) Field
14.Two feature options appear once you click on an item in a Reference Search
image. Which ones are they? - ANSWER Refined Topics and Search
Results
15.When an estimate is marked Completed, you can still modify it. - ANSWER
False
16.In some instances, you may leave items in violation if they are correct for
the scope of the estimate. - ANSWER True
17.If you want to make changes to an estimate that has a status of completed,
you must: - ANSWER Change the estimate status to In Progress.