The minimum length of saw-cut prisms shall be ..... inches
A. 8
B. 6
C. 4
D. 2 - Answer-Answer C. 4 inches
Movements can occur from a number of sources, such as
....
A. Ground settlement
B. Material expansion and contraction
C. Seismic activity
D. All of the above - Answer-Answer D. All of the above
,2|Page
The compressive strength of grout in concrete masonry
construction is recommended to be at least ..... to .....
times the design strength of the masonry assembly
A. 1.00 to 1.25
B. 1.25 to 1.33
C. 1.33 to 1.45
D. 1.45 to 1.60 - Answer-Answer B 1.25 to 1.33
The minimum clearance required between reinforcing
steel and the CMU in a grouted cell using course grout is
.....
A. 1 bar diameters
B. 1/4 inch
C. 1/2 inch
D. 1 inch - Answer-Answer C. 1/2 inch
The maximum grout pour using the high lift grouting
method for a clear cell area of 3 inches by 3 inches is .....
,3|Page
A. 5 feet
B. 8 feet using course grout
C. 12 feet
D. 24 feet using fine grout - Answer-Answer D. 24 feet
using fine grout
When the air temp is 25°F, requirements shall include .....
A. Heating the cement
B. Maintaining mortar on board above freezing
C. Heating sand above 120°F
D. Heating water above 120°F - Answer-Answer B.
Maintaining mortar temp
Control joints are considered joints that will ..... shortening,
shrinkage and/or reduction in the length of the wall.
A. Coordinate
B. Accommodate
C. Reduce
D. Control - Answer-Answer B. Accommodate
, 4|Page
A standard hook can be a 180° turn plus an extension of at
least ..... bar diameters, but not less than ..... inches at the
free end of the bar
A. 4,2.25
B. 4,2.5
C. 2.2.75
D. 2,3 - Answer-Answer B. 4bar diameters or 2.5 inches
The cleanout opening at the bottom of a masonry wall is a
minimum of .....
A. 3 inches in any direction
B. 4 inches by 4 inches
C. 32 inches
D. 2 inches in any direction - Answer-Answer A. 3" in any
direction
In a low lift grout pour, the grouting is stopped
approximately ..... below the top of the masonry unit.