General Contractor License - KB2 Study Prep - Full Set Questions and Correct Answers
General Contractor License - KB2 Study Prep - Full Set Questions and Correct Answers At what stage of the construction process would the builder cut out the sole plate in a door opening? - Correct Answer after the wall has been erected and braced When wide square edge boards are being used for board and batten siding, how should the batten strips be nailed ? - Correct Answer to only one siding board According to the code, the minimum allowable height of a guardrail at a restaurant deck (or any commercial building) is _____ inches above the finished floor height of the deck or balcony. - Correct Answer 42 If the blueprint does not disclose an exterior doors rough opening, then the standard practice would be to frame the width _____ oversize. - Correct Answer 2 inches How are resilient channels used in drywall application? - Correct Answer to decrease sound transmission in walls and partitions What screws are used to attach steel studs to the top and bottom steel track? - Correct Answer pan head, type S. It attaches stud to runner up to 14-ga In single family dwelling sleeping rooms, the minimum net clear opening width of windows, which are required for emergency egress or rescue, is _____ inches. - Correct Answer 20 According to the code what is the minimum slope on which asphalt strip shingles may be installed? - Correct Answer 2:12 According to Code the MAXIMUM diameter of a hole that may be bored in a 2 by 10 joist is _____ inches. - Correct Answer 3
Written for
- Institution
- General Contractor License
- Course
- General Contractor License
Document information
- Uploaded on
- April 19, 2026
- Number of pages
- 30
- Written in
- 2025/2026
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
at what stage of the construction process would th
-
when wide square edge boards are being used for bo
-
according to the code the minimum allowable heigh