Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SOS NERC PREP - REliability Exam QuEStiONS aNd CORRECt dEtailEd aNSwERS (VERifiEd aNSwERS) | latESt uPdatE 2026/2027||RaNkEd !!.

Beoordeling
-
Verkocht
-
Pagina's
76
Cijfer
A+
Geüpload op
19-04-2026
Geschreven in
2025/2026

SOS NERC PREP - REliability Exam QuEStiONS aNd CORRECt dEtailEd aNSwERS (VERifiEd aNSwERS) | latESt uPdatE 2026/2027||RaNkEd !!.

Instelling
SOS NERC PREP - REliability
Vak
SOS NERC PREP - REliability

Voorbeeld van de inhoud

SOS NERC PREP - REliability Exam QuEStiONS aNd CORRECt
dEtailEd aNSwERS (VERifiEd aNSwERS) | latESt uPdatE
2026/2027||RaNkEd !!.

The Reliability Coordinator just informed you of a slow time error correction which will begin at the top
of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias
Setting is -100 MW/.1Hz. What action should you take?



A) Increase Net Interchange Schedule by 20 MWs.



B) Inform the Reliability Coordinator that you cannot participate in the time error correction.



C) Decrease Net Interchange Schedule by 20 MWs.



D) Increase Net Interchange Schedule by 10 MWs. - aNSwER-A) Increase Net Interchange Schedule by
20 MWs.



A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen
instantaneously in the change of which of the following values?



1. Actual Net Interchange

2. Scheduled Frequency

3. Scheduled Net Interchange

4. Area Control Error



A) 4 only

B) 1 & 3

C) 1 & 4

D) 3 & 4 - aNSwER-C) 1 & 4

,Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency,
and all __________.



A) Tie lines readings

B) Generators output

C) Scheduled frequency indications

D) Transformer load - aNSwER-A) Tie lines readings



Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is
+100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority A's frequency bias
setting is 100 MW/0.1 Hz, what is ACE?



A) -100

B) 0

C) 10

D) 100 - aNSwER-A) -100




A Transmission line is loaded 25% above its SOL. A parallel line is out for routine maintenance and can be
placed in service in 10 minutes. What is the first step the Operator should take to reduce the line
loading?



A)Shed load at the downstream bus.



B) Open the line.



C) Re-Dispatch Generation.



D) Initiate the restoration of the parallel line. - aNSwER-D) Initiate the restoration of the parallel line.

,As a Transmission Operator, you realize that the voltage level is starting to decline in the North West part
of the system. Which of the following devices should you, as a Transmission Operator, be able to
operate, and/or have another entity operate to raise the voltage level back to normal in the North West
part of the system?



A) Transformer Underload Tap Changers

B) Shunt Capacitor Banks

C) Generator Reactive Output

D) All answers are correct - aNSwER-D) All answers are correct



Voltage reduction for load relief should be made on the __________.



A) Distribution system

B) Entire Interconnection simultaneously

C) Tie-lines with other Balancing Authority Areas

D) Transmission System - aNSwER-A) Distribution system



Under Frequency Load Shedding (UFLS) is to stabilize the imbalance between generation and load that
has been created by a system disturbance. This is accomplished by ____________.



A) Tripping generation first

B) Voltage reduction on the distribution system.

C) Shedding all load to arrest frequency

D) Shedding load prior to generation tripping - aNSwER-D) Shedding load prior to generation tripping



Failure to meet the DCS criteria of recovery within 15 minutes results in which consequence for a
specified time period for the Balancing Authority's failure to recover?



A) Increased Contingency Reserve requirements

B) Decertification as a Balancing Authority

, C) Not allowed to supply regulation services

D) Expulsion from the Reserve Sharing Group - aNSwER-A) Increased Contingency Reserve
requirements



A Balancing Authority foresees or is experiencing conditions where all available resources are committed
to meet firm load, and firm transactions. The BA should request which level of the Energy Emergency
Alerts?



A) Energy Emergency Alert Level 2

B) Energy Emergency Alert Level 4

C) Energy Emergency Alert Level 1

D) Energy Emergency Alert Level 3 - aNSwER-C) Energy Emergency Alert Level 1



Preparations are being made to tie two islands together during restoration. Island "A" has a frequency of
58.95 Hz and Island "B" has a frequency of 59.97 Hz. What action should be taken to synchronize the two
islands?



A) Shed load in Island "B"

B) Shed load in Island "A".

C) Disable the Synch Check Relay.

D) Increase generation in Island "B". - aNSwER-B) Shed load in Island "A".



You experience a full system shutdown. You are in the process of restoring load and you are concerned
about re-collapsing the system. Which is the best approach in the restoration process that will help
ensure your system will be restored successfully?



A) Maintain frequency between 59.5 HZ and 60.5 HZ.



B) If the system has stabilized at below 60 HZ, shed 15% - 20% of the load to raise the frequency to 61
HZ.

Geschreven voor

Instelling
SOS NERC PREP - REliability
Vak
SOS NERC PREP - REliability

Documentinformatie

Geüpload op
19 april 2026
Aantal pagina's
76
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DoctorDee Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
25
Lid sinds
2 jaar
Aantal volgers
7
Documenten
4429
Laatst verkocht
1 dag geleden
Hi wayne1111

3.5

6 beoordelingen

5
3
4
0
3
1
2
1
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen