Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

GE 114-TOPIC 2 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

Beoordeling
-
Verkocht
-
Pagina's
2
Cijfer
A+
Geüpload op
20-04-2026
Geschreven in
2025/2026

GE 114-TOPIC 2 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026 precise position; stations; large area - Answers Control surveying is referred to as the determination of the _____ _____ of a number of _____ which are distributed over a _____ _____. topographic and hydrographic - Answers The established stations of the system serve as the basis for originating or checking other subordinate surveys for engineering projects such as _________ and _________ mapping; planning, design, and layout of highways and rail roads; delineation of property or political boundaries. (Putt, 1990) vertical and horizontal; three dimensional - Answers Mine surveys are done with both ______ and _______ control, locating the features in a _____ _________ manner. Types of Control Surveys - Answers Horizontal Control o Control by Traversing o Control by Triangulation o Control by Trilateration Vertical Control o Control by Leveling Horizontal Control - Answers Horizontal control surveys coordinate horizontal positional data. These positions can be referenced by parallels or plane coordinate axes. Because they are used as a framework for other surveys,these surveys must be precise and accurate. horizontal; parallels or plane; precise and accurate - Answers Horizontal control surveys coordinate________ positional data. These positions can be referenced by ______ or ______ coordinate axes. Because they are used as a framework for other surveys, these surveys must be ________ and __________. Control by Traversing - Answers This procedure is generally less any expensive and can be extended in direction. It can be undertaken even under less favorable weather conditions. However, its main disadvantage is that there are fewer checks available when there is a need to locate surveying errors and mistakes (Putt, 1990) Control by Triangulation - Answers Triangulation surveys consist of networks of geometric figures with almost all the angles measured directly in the field with relatively few of sides measured (Putt,1990). The positions of widely separated points are determined. The lengths and directions of the lines joining these distant points also need to be determined. With triangulation more than one route can be used in moving through the system to calculate desired lengths (Putt,1990).

Meer zien Lees minder
Instelling
GE 114
Vak
GE 114

Voorbeeld van de inhoud

GE 114-TOPIC 2 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

precise position; stations; large area - Answers Control surveying is referred to as the determination
of the _____ _____ of a number of _____ which are distributed over a _____ _____.
topographic and hydrographic - Answers The established stations of the system serve as the basis for
originating or checking other subordinate surveys for engineering projects such as _________ and
_________ mapping; planning, design, and layout of highways and rail roads; delineation of property
or political boundaries. (Putt, 1990)
vertical and horizontal; three dimensional - Answers Mine surveys are done with both ______ and
_______ control, locating the features in a _____ _________ manner.
Types of Control Surveys - Answers Horizontal Control
o Control by Traversing
o Control by Triangulation
o Control by Trilateration

Vertical Control
o Control by Leveling
Horizontal Control - Answers Horizontal control surveys coordinate horizontal positional data. These
positions can be referenced by parallels or plane coordinate axes. Because they are used as a
framework for other surveys,these surveys must be precise and accurate.
horizontal; parallels or plane; precise and accurate - Answers Horizontal control surveys
coordinate________ positional data. These positions can be referenced by ______ or ______
coordinate axes. Because they are used as a framework for other surveys, these surveys must be
________ and __________.
Control by Traversing - Answers This procedure is generally less any expensive and can be extended
in direction. It can be undertaken even under less favorable weather conditions. However, its main
disadvantage is that there are fewer checks available when there is a need to locate surveying errors
and mistakes (Putt, 1990)
Control by Triangulation - Answers Triangulation surveys consist of networks of geometric figures
with almost all the angles measured directly in the field with relatively few of sides measured
(Putt,1990).

The positions of widely separated points are determined. The lengths and directions of the lines
joining these distant points also need to be determined. With triangulation more than one route can
be used in moving through the system to calculate desired lengths (Putt,1990).
Control by Trilateration - Answers In this procedure, the lengths of the sides of a series of triangles
are measured and the angles computed are from the lengths.Trilateration is the most accurate of the
three methods of establishing horizontal control because distances are measured more accurately
than angles (Putt,1990).

Just like triangulation, it has advantage that checks can be made in the calculations while moving
through the system by more than one possible route (Putt,1990).
Vertical Control Surveys - Answers is establishment of a network of reference bench marks.
Mine surveying - Answers is undertaken to support mining activities through provision of control
points for mining locations. These controls infrastructure construction and also for coordination are
used for of points within the mining areas.
Mine Surveying - Answers This type of surveying is more accurately undertaken than the other types
of survey and often involves use of more precise equipment.
Traversing and Leveling - Answers Methods of Establishing Controls in Underground Mining
Mean Sea Level and Geoid - Answers Vertical Controls
Traversing - Answers establishing of horizontal construction purposes or for delineating control
points are useful for feature boundaries, generation of topographic maps and also for detailed maps
for engineering works.
Link Traverse - Answers A closed route that starts from a known point and end at another known
point. It is geometrically open but mathematically close.
Loop Traverse - Answers If the traverse starts from a known point and closes at the same point, then
it is known as a _________ .

Geschreven voor

Instelling
GE 114
Vak
GE 114

Documentinformatie

Geüpload op
20 april 2026
Aantal pagina's
2
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TutorJosh Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
440
Lid sinds
1 jaar
Aantal volgers
16
Documenten
31720
Laatst verkocht
3 dagen geleden
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.5

73 beoordelingen

5
26
4
16
3
14
2
1
1
16

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen