Mk1 swe EXAM QUESTIONS WITH CORRECT
ANSWERS
what are two types of maintenance - CORRECT ANSWER✔✔-Corrective and
| | | | | | | | | |
preventative
What article always captain to conduct NJP - CORRECT ANSWER✔✔-Article 15
| | | | | | | | | |
Where two types of procedures that may be accessed from maintenance
| | | | | | | | | | |
procedure option - CORRECT ANSWER✔✔-Official and local
| | | | | |
Who is authorized to conduct tag outs - CORRECT ANSWER✔✔-Authorizing
| | | | | | | | | |
officer
Out of calibration tags should be used when - CORRECT ANSWER✔✔-When
| | | | | | | | | | |
indicating parameter errors are small and consistent
| | | | | |
For modernized units the boat inspection reports are to be entered through -
| | | | | | | | | | | | |
CORRECT ANSWER✔✔-Almis/ EALpage| |
Cutter engineering report shall be completed in accordance with - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Naval engineering manual chapter 90 | | | |
On an MPC the warning shall come where in the text - CORRECT ANSWER✔✔-
| | | | | | | | | | | | |
Before the instruction | |
,On an MPC what would constitute an expendable - CORRECT ANSWER✔✔-Rags
| | | | | | | | | |
PMS that does not need to be included in the cutter engineering report is -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Daily and weekly | | |
With regards to casreps what is mandatory on all updates corrects and
| | | | | | | | | | | |
cancellations - CORRECT ANSWER✔✔-REF | | |
Which unit besides a shore unit are exempt from filling out the POSIT line -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Cutter underway | |
A casrep it should be made as soon as possible no later than ____hours -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-24 |
Casualties that effect a secondary mission should always have a casualty category
| | | | | | | | | | | |
of - CORRECT ANSWER✔✔-2
| | |
AMPN is mandatory after any set that contains an entry of? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Other, tech, none | |
In a 1PARTSID if the NIIN is not known what needs to be put in the line -
| | | | | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Unknown |
What is the criteria for submitting CASCOR - CORRECT ANSWER✔✔-The delay
| | | | | | | | | | |
expressed an hours, and correcting the casualty due to parts unavailability, a list
| | | | | | | | | | | | |
, of all parts requested and dates received; the total number of man-hours
| | | | | | | | | | | |
expanded; the number of equipment hours since last failure
| | | | | | | |
You find something else wrong with the piece of equipment that has already
| | | | | | | | | | | | |
been CASREP'd you should send an? - CORRECT ANSWER✔✔-Update
| | | | | | | |
Where do you find the hierarchy of guidance for specification plans - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-NEM chapter 41 | |
Which specifications may be used as a guided researching propose engineering
| | | | | | | | | | |
changes and solutions - CORRECT ANSWER✔✔-GSO
| | | | |
Which specification do not apply to construction, alteration or maintenance of
| | | | | | | | | | |
Coast Guard cutters - CORRECT ANSWER✔✔-Commercial general specifications
| | | | | | | |
for t-ships
|
Where do you find the authorized material list for deck coverings - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Naval engineering manual chapter 634 | | | |
110 - WPB - 521-01, what does 5 21 represent - CORRECT ANSWER✔✔-SW BS
| | | | | | | | | | | | | |
number
Enthusiasm for realistic drills must outweigh sound judgment, or sound
| | | | | | | | | |
evaluation of the______ - CORRECT ANSWER✔✔-State of the crew
| | | | | | | |
ANSWERS
what are two types of maintenance - CORRECT ANSWER✔✔-Corrective and
| | | | | | | | | |
preventative
What article always captain to conduct NJP - CORRECT ANSWER✔✔-Article 15
| | | | | | | | | |
Where two types of procedures that may be accessed from maintenance
| | | | | | | | | | |
procedure option - CORRECT ANSWER✔✔-Official and local
| | | | | |
Who is authorized to conduct tag outs - CORRECT ANSWER✔✔-Authorizing
| | | | | | | | | |
officer
Out of calibration tags should be used when - CORRECT ANSWER✔✔-When
| | | | | | | | | | |
indicating parameter errors are small and consistent
| | | | | |
For modernized units the boat inspection reports are to be entered through -
| | | | | | | | | | | | |
CORRECT ANSWER✔✔-Almis/ EALpage| |
Cutter engineering report shall be completed in accordance with - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Naval engineering manual chapter 90 | | | |
On an MPC the warning shall come where in the text - CORRECT ANSWER✔✔-
| | | | | | | | | | | | |
Before the instruction | |
,On an MPC what would constitute an expendable - CORRECT ANSWER✔✔-Rags
| | | | | | | | | |
PMS that does not need to be included in the cutter engineering report is -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Daily and weekly | | |
With regards to casreps what is mandatory on all updates corrects and
| | | | | | | | | | | |
cancellations - CORRECT ANSWER✔✔-REF | | |
Which unit besides a shore unit are exempt from filling out the POSIT line -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Cutter underway | |
A casrep it should be made as soon as possible no later than ____hours -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-24 |
Casualties that effect a secondary mission should always have a casualty category
| | | | | | | | | | | |
of - CORRECT ANSWER✔✔-2
| | |
AMPN is mandatory after any set that contains an entry of? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Other, tech, none | |
In a 1PARTSID if the NIIN is not known what needs to be put in the line -
| | | | | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Unknown |
What is the criteria for submitting CASCOR - CORRECT ANSWER✔✔-The delay
| | | | | | | | | | |
expressed an hours, and correcting the casualty due to parts unavailability, a list
| | | | | | | | | | | | |
, of all parts requested and dates received; the total number of man-hours
| | | | | | | | | | | |
expanded; the number of equipment hours since last failure
| | | | | | | |
You find something else wrong with the piece of equipment that has already
| | | | | | | | | | | | |
been CASREP'd you should send an? - CORRECT ANSWER✔✔-Update
| | | | | | | |
Where do you find the hierarchy of guidance for specification plans - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-NEM chapter 41 | |
Which specifications may be used as a guided researching propose engineering
| | | | | | | | | | |
changes and solutions - CORRECT ANSWER✔✔-GSO
| | | | |
Which specification do not apply to construction, alteration or maintenance of
| | | | | | | | | | |
Coast Guard cutters - CORRECT ANSWER✔✔-Commercial general specifications
| | | | | | | |
for t-ships
|
Where do you find the authorized material list for deck coverings - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Naval engineering manual chapter 634 | | | |
110 - WPB - 521-01, what does 5 21 represent - CORRECT ANSWER✔✔-SW BS
| | | | | | | | | | | | | |
number
Enthusiasm for realistic drills must outweigh sound judgment, or sound
| | | | | | | | | |
evaluation of the______ - CORRECT ANSWER✔✔-State of the crew
| | | | | | | |