And Correct Answers
The activities of line, hangar, and shop maintenance constitute the ____ aspects of
M&E
Production
Unscheduled maintenance, or work generated by inspections is considered a/an ____
task
Non-routine
In a partially decentralized organization
Forecasting and Planning is performed by PP&C, while Control is done by another work
center
Preliminary planning consists of
Developing the maintenance program by engineering
PP&C's forecasting activities include
Estimating maintenance workload
,____ will inspect organizations keep up-to-date copies of publications issued by tech
pubs
Q&A
Which of the following is true about a controlled document?
They are used to certify airworthiness
In addition to maintaining a main library for M&E, the airline may choose to have
several ____
Satellite libraries
The effectiveness of a system is measured by
The extent to which the system goals are achieved
People who interface with the system are considered
Elements of the system
Upgrade and refresher training are?
, Accomplished on an 'as necessary' basis
When personnel are fully trained and there are insignificant fleet or personnel
changes, it can be concluded that
A full time M&E training organization may not be necessary
Which type of training is usually accomplished before a mechanic is hired?
Formal
When someone meets the qualifications of FAR 65.71 to be an AMT, what is the
mechanic qualified for?
The A&P license
Regardless of an airline's organizational training structure, who maintains control of
training?
M&E organization
Required management personnel required for an FAR part 135 operations does NOT
include:
Director of safety