Verified Answers |Latest Version |Already Graded A+
An EXCITER on a traditional generator does what? ✔Correct Answer-Voltage regulation (AVR)
if you change the excitation current, you change the voltage.
ECO Min, ECO Max, and EMERG Max are genrator _________________. ✔Correct Answer-
Limits
When synchronizing to the interconnection, what needs to be synchronized? ✔Correct
Answer-Frequency, Voltage, and phase angle.
GMD (GeoMagnetic Disturbance) procedure is implemented when? ✔Correct Answer-10A or
greater is measured by special equipment at Missouri Ave or Meadowbrook and the
measurement is confirmed by one of the following other sources: Excess transformer current @
Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR requirements on transformers @
Hopw Creek or Salem nuclear subs, or high DC measurements @ Limerick or Peach Bottom.
What are the 2 types of National Terrorism Advisory Alerts? ✔Correct Answer-Elevated and
Imminent.
What action does PJM take for a terrorist attack, fuel delivery emergency, or GMD's?
✔Correct Answer-Conservative Operations
What does PJM put the most emphasis on during a terrorist/sabotage event? ✔Correct
Answer-Operations and Communications
What does PJM request during a low voltage alert? ✔Correct Answer-RRC - reactive reserve
check
PJM issues a Heavy Load Voltage Warning how many hours prior to implementation?
✔Correct Answer-4 hours
What should generation owners/operators do during a High System Voltage Action? ✔Correct
Answer-Operate at the lower bandwidth of the voltage schedule.
How many hours do you have to report a 24-hr reportable NERC disturbance? ✔Correct
Answer-6 hours
What report is generated during a Max Emergency Gen Alert? ✔Correct Answer-SSR -
Supplementary Status Report
, What part of the SSR is the Fuel Limited Resources accounted for? ✔Correct Answer-Part G
Resource Limited Units which are units that are not able to run at max capacity for more than
72 hours.
What kind of Emergency Procedures occur during real time operating hours? ✔Correct
Answer-Actions
What is the per Unit (p.u.) for a 345 kV nominal voltage that is currently at 348 kV? ✔Correct
Answer-348/345 = 1.008 pu
What is the Emergency Reducible Generation (ERG) if the Eco Min is 100 and the Emergency
Min is 75? ✔Correct Answer-Eco Min - Emerg Min = 25MW
How many Black Start units are required for critical load/TO zone? ✔Correct Answer-2 Black
Start units
What is the minimum amount of hours for fuel supply for Black Start units? ✔Correct Answer-
10 hours, must notify PJM when it reaches that level.
Regulation must be attainable within how many minutes? ✔Correct Answer-5
ACE - Area Control Error is used to balance what 2 things? ✔Correct Answer-Generation and
Load
If your ACE in your control area is -1500, what would you do? ✔Correct Answer-100%
spinning (synchronized) reserves
Synchronized reserves is generation output from a synchronized resource that can be increased
w/in 10 min or? ✔Correct Answer-Reduction in load from a synchronized resource w/in 10
min.
When data exchange between PJM and Member Company is not available what will PJM do?
✔Correct Answer-Manual Dispatch
The satellite phone test is required of generator operating control centers with one or more
units totaling how many MW's? ✔Correct Answer-500 MW
What is the maximum overall inaccuracy allowed for data exchange? ✔Correct Answer-2%
What size generating units must provide instantaneous power and reactive flow data?
✔Correct Answer-10 MW and above
How often must PJM be updated for manually entered data? ✔Correct Answer-30 min