|Latest Version |Already Graded A+
Which of the following are aspects of site development typically constrained by zoning
regulations? ✔Correct Answer-1. Building setbacks
2. Historic preservation requirements
3. Signage restrictions
An architect is preparing the critical path for the design phase of a project.
Which is the critical path? ✔Correct Answer-2-4-5. Path 2-4-5 is 14 weeks' long and is the
longest path. It is the critical path that the construction schedule will be set by.
A list of special inspections as required by the county building inspector follows. The reinforcing
in the post-tensioned slab will be inspected next. Click on the box in the list that corresponds to
this inspection. ✔Correct Answer-The reinforcing for post-tensioned concrete is included in
the inspection for item #5 - Prestressed Concrete and PT tendons. PT stands for post-tensioned
and the tendons are the steel cables that reinforce the slab.
Which documents will the architect need to include in both the project manual and contract
documents package? ✔Correct Answer-1. Technical specifications
2. Owner-contractor agreement
3. Supplementary conditions. The supplementary conditions outline procedural, administrative,
and contractual requirements unique to the project.
4. General conditions. The general conditions describe the rights, responsibilities, and
relationships of the owner, the contractor, and the architect.
A new mixed-use apartment complex is being planned just west of an existing city center. In
conducting site analysis, the project architect documents a myriad of existing transportation
options.
Which of the following is a true statement about the existing transportation on site?
✔Correct Answer-It promotes transit-oriented development (TOD). Existing transportation on a
project site can provide opportunities for the architect by meeting city or county zoning
requirements or ordinances that require a TOD, (i.e., higher-density zoning)
The firm has not yet received the request for proposal (RFP) from the owner.. What should be
the project manager's next step in assigning staff members to the project? ✔Correct Answer-
Hold off on assigning staff members to the project team until after the request for proposal has
been received
Near the end of project construction, the owner requests to use the existing plans to construct
another restaurant on a different site across town.