Version |Already Graded A+
1. Real time transmission constraints or ott cost (out of merit)
contingencies may be alleviated with generators
operating
2. what is the minimum size for a solar park to be 3 MW
re-quired to have real and reactive power?
3. PJM calls for which of the following to recover the
ACE so that tie line schedules are maintained? synchronized reserves
4. If not cancelled by PJM, the minimum generation alert at the end of the
specified
expires light load period
5. When PJM declares a hot weather alert, the generation determine if
maintenance
dispatcher should can be deferred
6. During system restoration, the two categories of dynamic and
re-serves are
spinning
7. During System Restoration, frequency should be main- 59.75 and 61.00 Hz
tained between:
8. PJM issues a heavy load voltage schedule.
Member companies who own generation ensure voltage
facilities should regulators on
generating units are
9. A unit being dispatched economically by PJM in service on
should set its MW output based on the automatic
Unit's dispatch rate or
de-sired MW level
10. What hourly revenue data is required of a generator by Compensated
1/
9
, PJM Generation Exam with all Correct & 100% Verified Answers |Latest
Version |Already Graded A+
MWh deliv-
PJM? ered by each unit
11. During system restoration prior to synchronization Stabilize unit
of a unit, the dispatcher should ensure sufficient
load is available to operation
2/
9