NJ Lead Supervisor Test Prep
Study online at https://quizlet.com/_g0zb1p
1. Internal levels per NJAC: 5:17 Level 1: One layer of poly every 5 feet
Level 2: Two layers of poly with a flap on all
doorways, warning signs at the entry but not
building entry, residents can stay but not in
work area. Remove all furniture and seal large
items in plastic sheeting.
Level 3: Same as first two but residents can't be
in dwelling during the day. They can return at
the end of the day when the site is cleaned up.
5 day time limit
Level 4: Same as first two but the residents
cannot return until clearance is given at the end
of project. no time limit
2. What is NJAC 5:17 for? NJ Admin Code for Lead Hazard Evaluation
3. What is NJAC8:51 or chapter 51 for? Childhood lead poisoning (EBLs)
4. What is NJAC 8:62 for? The standard for certification/training
5. What regulation covers respiratory pro- 29CFR1910.134
tection?
6. What is 1910.1200 cover Hazardous Comms: Specifically, it requires a
chemical component disclosure book full of
Safety Data Sheets of all products used on site.
7. What is the name of the three major HUD
players in the Industry OSHA
EPA
, NJ Lead Supervisor Test Prep exam guide!!!!!!
NJ Lead Supervisor Test Prep
Study online at https://quizlet.com/_g0zb1p
8. HUD was created for Affordable housing
9. What are some of the rules that came The Lead Based Paint Poisoning Prevention Act
from HUD? (LBPPA)
The guidelines for the disclosure rule
10. What is UCC? Uniform Construction Code
11. What is a GFCI? Shock Suppressor
12. What is PFAS? Personal Fall Arrest System
13. Following the completion of lead haz- provide the owner with a written disclosure of
ardous work, the contractor must the work performed with the scope of work.
14. When removing lead-based paint chips, Lightly misting prior and plastic sheeting
what are best practices?
15. Enclosure methods material Drywall
Fiberboard
OR Functional equivalent
16. When using screws in the drywall enclo- bite an inch into the stud or structure.
sure, they must
17. Exterior Levels Level 1: One layer of poly every 6 feet (6 mil thick
poly) Barrier system (10ft by 3ft if more than
one story)
Level 2: Two layers of poly with a flap on all
doorways, warning signs, residents can stay but
not in work area. Remove all furniture and seal
, NJ Lead Supervisor Test Prep exam guide!!!!!!
NJ Lead Supervisor Test Prep
Study online at https://quizlet.com/_g0zb1p
large items in plastic sheeting. Barrier system
(10ft by 3ft if more than one story)
Level 3: Same as first two but residents can't be
in dwelling during the day. They can return at
the end of the day when the site is cleaned up.
18. What are forms of Interim control? Education (Giving the disclosure pamphlet)
Specialized cleaning (HEPA, Wash, HEPA) with
TCP cleaning product
Ongoing monitoring (Repairs, repainting and
maintenance)
19. When must cleaning occur after an No sooner than 1 hour after
abatement job is completed?
20. Clearance Test Floor (10)
Window Sil (100)
Window well (400)
In every room worked
21. Who performs the clearance test? Risk Assessor or dust sampler
22. At what level does chelation occur? Adults (50 ug/dl)
Kids (40 ug/dl)
23. What is the most important part of a Contract Specifications (Scope of Work)
contract for contractors?
General Conditions