ISDS 4111 QUIZ 6 TEST QUESTIONS AND CORRECT
ANSWERS LATEST VERSION
When transferring plants to one another, a FI paperwork
Choose one:
a. Is produced in both two-step and one-step motions.
b. Is only made in two steps.
c. Is only made in single steps.
d. Is not produced. Both one-step and two-step actions are used to form
ANSWER a.
Which of the following takes place at the receiving plant when stock is
transferred from a plant with warehouse management to one without?
Choose one:
a. WM process stages are triggered by a goods receipt.
b. IM records a simple goods receipt.
c. WM process stages are triggered by a products issue.
b. A simple products issue is noted in instant messaging.
e. None of the above— ANSWER b. IM records a simple goods receipt.
Which of the following describes a request to modify the material's status?
Choose one:
a. Posting a notice of change
b. Change notice
c. List of material changes
d. List of status requests
e. Requesting a change and responding a. Posting a notice of change
Pallet storage, rack storage, and shelf storage are a few types of
Choose one:
containers for storage.
b. Storage facilities.
d. Sections for storage.
d. Types of storage.
e. None of the above— ANSWER d. Types of storage.
Usually, warehouse management is utilised
Choose one:
a. By companies with limited material resources.
, b. By shipping firms.
c. By businesses with a costly inventory or a lot of materials.
d. By storage firms.
c. By businesses that require improved inventory reporting. ANSWER c. By
businesses who have costly inventory or a lot of goods.
When two places are physically close to one another and there is no appreciable
delay between issue and receipt, which of the following choices is appropriate?
Choose one:
a. One-step process
b. A two-step process
c. A three-step process
d. Order for stock transportation
e. None of the aforementioned— ANSWER a. One-step process
You discover that a specific material needs to be relocated from several source
bins when drafting a transfer order. Based on this scenario, which of the
following claims is true?
Choose one:
a. There will be several line items for the material in the transfer order.
b. It is necessary to create multiple transfer orders.
d. The content will be written as a single line item.
d. To transfer the item into a single source bin, an internal order request will be
made.
g. This situation is not feasible. ANSWER a. There will be several line items
for the material in the transfer order.
During the manufacturing process, a goods issue represents
Choose one:
a. Transporting semifinished or raw items from a work center to storage
containers.
b. Trading or shipping completed products to a client in order to complete a
sales order.
b. Fulfilling a production order with completed goods.
d. Delivering completed items to a client in response to a request for goods.
a. Supplying semifinished or raw materials to a production order. ANSWER e.
Supplying semifinished items or raw materials to a production order.
Transfer orders can be automatically generated by the ERP system, but only
when
Choose one:
a. The destination is known.
b. The reference document is necessary for the transfer.
ANSWERS LATEST VERSION
When transferring plants to one another, a FI paperwork
Choose one:
a. Is produced in both two-step and one-step motions.
b. Is only made in two steps.
c. Is only made in single steps.
d. Is not produced. Both one-step and two-step actions are used to form
ANSWER a.
Which of the following takes place at the receiving plant when stock is
transferred from a plant with warehouse management to one without?
Choose one:
a. WM process stages are triggered by a goods receipt.
b. IM records a simple goods receipt.
c. WM process stages are triggered by a products issue.
b. A simple products issue is noted in instant messaging.
e. None of the above— ANSWER b. IM records a simple goods receipt.
Which of the following describes a request to modify the material's status?
Choose one:
a. Posting a notice of change
b. Change notice
c. List of material changes
d. List of status requests
e. Requesting a change and responding a. Posting a notice of change
Pallet storage, rack storage, and shelf storage are a few types of
Choose one:
containers for storage.
b. Storage facilities.
d. Sections for storage.
d. Types of storage.
e. None of the above— ANSWER d. Types of storage.
Usually, warehouse management is utilised
Choose one:
a. By companies with limited material resources.
, b. By shipping firms.
c. By businesses with a costly inventory or a lot of materials.
d. By storage firms.
c. By businesses that require improved inventory reporting. ANSWER c. By
businesses who have costly inventory or a lot of goods.
When two places are physically close to one another and there is no appreciable
delay between issue and receipt, which of the following choices is appropriate?
Choose one:
a. One-step process
b. A two-step process
c. A three-step process
d. Order for stock transportation
e. None of the aforementioned— ANSWER a. One-step process
You discover that a specific material needs to be relocated from several source
bins when drafting a transfer order. Based on this scenario, which of the
following claims is true?
Choose one:
a. There will be several line items for the material in the transfer order.
b. It is necessary to create multiple transfer orders.
d. The content will be written as a single line item.
d. To transfer the item into a single source bin, an internal order request will be
made.
g. This situation is not feasible. ANSWER a. There will be several line items
for the material in the transfer order.
During the manufacturing process, a goods issue represents
Choose one:
a. Transporting semifinished or raw items from a work center to storage
containers.
b. Trading or shipping completed products to a client in order to complete a
sales order.
b. Fulfilling a production order with completed goods.
d. Delivering completed items to a client in response to a request for goods.
a. Supplying semifinished or raw materials to a production order. ANSWER e.
Supplying semifinished items or raw materials to a production order.
Transfer orders can be automatically generated by the ERP system, but only
when
Choose one:
a. The destination is known.
b. The reference document is necessary for the transfer.