Give this one a try later!
??? It follows a functional flow
What part of the 4P model is the foundation of the Toyota Production System.
Give this one a try later!
??? not process
An important guideline for the facilitator or leader of a Kaizen event is to ___.
,Give this one a try later!
Be flexible
What should a future state map show?
Give this one a try later!
Desired improvement to the current state
In the toyota Production System "house", in which pillar does the system stop
automatically when a problem occurs?
Give this one a try later!
Jidoka
Which work tool helps to ensure that equipment operates as it should?
Give this one a try later!
Total Productive Maintence
What happens during the control step?
Give this one a try later!
, It involves verifying that the benefits including financial, ascribed to the
improvement project are real and maintaining the improvements
In the House of Quality, WHATS is a list of
Give this one a try later!
What the customer wants/requires
An external customer is someone who
Give this one a try later!
is outside the organization and uses your products/services
The first requirement for making a time study is having a timing device. (T/F)
Give this one a try later!
True
Which of the following is a way to gather customer requirements?
Give this one a try later!