◉ EAL unscheduled maintenance. Answer: AMMIS supply
management, ACS configuration management
◉ Unscheduled maintenance without MPC's are documented where.
Answer: EAL
◉ What does SFLC use to identify trends and potential reliability
deficiencies. Answer: Supply and demand rates/failure data
◉ What is FRACAS. Answer: Failure reporting and corrective action
system
◉ What is a time directed task. Answer: Life renewal, regardless of
condition
◉ A blank fault safety shorting probe shall be conspicuously located
in all engineering spaces containing switch boards or other installed
high-voltage electrical equipment. Answer: 25,000 V
,◉ Do not itemize fuel when using it as a what. Answer: Solvent
◉ PD 680, type two flashpoint 140 F and biotech HI SOLV space are
available from where. Answer: NSS
◉ Never use what as a solvent. Answer: Gas
◉ What is considered a hot surface for fuel?. Answer: 400°
◉ What is a hot surface for lube or hydraulic oil?. Answer: 650°
◉ What is the reference temperature for insulated surfaces. Answer:
The temperature under the insulation
◉ What is a normal operating station?. Answer: The place where the
watch stands or the position from which he or she shifts duplex
strainers
◉ NSTM chapter 635 provides guidance on what. Answer: Piping
insulation and protective covers
◉ What must shields be made of?. Answer: Sheet metal, or three
layers of aluminized glass cloth secured withdrawals string
,◉ At a minimum, there shall be how many smoke detectors in each
passageway that serves a living or burning area. Answer: One
◉ What shall be posted in a visible location next to all machinery
that could cause damage to personnel, systems or equipment,
including any rotating machinery, electrical equipment, abductor, or
internal combustion systems. Answer: Permanent safety precautions
◉ Bond straps or wire shall be braided and of a size not less than
what. Answer: Number 6AWG or equivalent cross-sectional area
◉ For gas powered boats fuel line shall meet what standard.
Answer: USCG type A2, USCG type B1 or USCG type B2
◉ Blank shall be used and when disconnected, they shall
automatically stop fuel flow. Answer: Quick disconnect
◉ How should fuel components such as filters be supported?.
Answer: Independently
◉ What valves shall be installed at the fuel tank outlet?. Answer:
Plug cock or diaphragm fuel shut off valves
, ◉ What should be used to secure battery terminals. Answer: Hex
nuts
◉ High tension leads in the ignition system must be carefully
checked for what. Answer: Proper insulation to prevent external
arching
◉ When fueling boats ground the fill nozzle to the Phil connection to
eliminate the possibility of what. Answer: Spark as a result of
electrostatic buildup
◉ How often should portable fuel oil, tanks, and containers be
visually inspected. Answer: Every two years
◉ How often shall installed fuel tanks be cleaned flushed and
inspected. Answer: Every two years
◉ Where can DCC functions be performed?. Answer: At the cutters
commander control station/bridge or maybe co-located with the
primary repair locker
◉ What are the two categories of high-level maintenance?. Answer:
Organizational and depot