Pareto, flow, run, and scatter chart
What is the focus of 'Lean'
Give this one a try later!
focus on whatever adds value and eliminates wastes in the process
What is just in time manufacturing?
, Give this one a try later!
,JIT produce an output as soon as the next step in the process needs it
What is the optimal desired level of defect?
Give this one a try later!
Zero continue improving so that we can get as close to zero as possible
What is a bimodal distribution?
Give this one a try later!
The histogram contains at least two peaks
What is Kanban
Give this one a try later!
it's any signal used to pull materials into the value stream on demand using
the 'pull method'
Basic check sheet
Give this one a try later!