Improve and Control
warning signal
Give this one a try later!
alerts the operators but doesn't shut down the process
measurement system
,Give this one a try later!
verify that we can accurately measure inputs and outputs
8 types of waste
Give this one a try later!
(WORMPIIT) waiting, overproduction, rework, motion, processing,
inventory, intellect, and transportation
LSS data collection process
Give this one a try later!
determine question>decide on analysis tools>obtain data
7 phases of lean six sigma
Give this one a try later!
recognize, define, measure, analyze, improve, control, and realization
CTQ
Give this one a try later!
, Critical to Quality; factors that are recognized to be critical to customer
satisfaction
8 rules of control charts that show a special cause variation
Give this one a try later!
1 point outside of zone A; 9 points on one side of the center line; 6 points
increasing or decreasing; 14 points alternating up and down every other
time; 2 of 3 points in zone A or beyond; 4 of 5 points in zone B or beyond;
15 points within zone C, 8 points with none in zone C on both sides of the
center line
scatter plot
Give this one a try later!
continuous y vs continuous x
Shewhart's beliefs about variance
Give this one a try later!
there are 2 basic components of variation: common cause and special
cause