The three measures that the consequence of a failure are measured on:
severity, occurrence, and detection
S: Severity of the effect on the customer or client,
O: Frequency with which the problem is likely to occur, and
D: the difficulty with which the problem can be detected
The equation is SOD, each is scored on a scale of 1 to 10
T/F: A well designed control plan will not need to be adjusted in the future.
Give this one a try later!
, False
T/F: FMEA focuses on finding the root-cause of a problem after units have been
processed and before they are shipped to the customer.
Give this one a try later!
False: FMEA analysis is undertaken before a process is designed.
What is a Fishbone diagram?
Give this one a try later!
A visual identification of many potential causes of a
problem
Is it realistic for all companies to strive for Six Sigma? What is the general quality
target for most organizations?
Give this one a try later!
, No. The cost to get this near level of perfection would be prohibitive to
most companies. Four Sigma is generally the quality target for most
organizations
The development of a control chart relies on which concepts? (3)
Give this one a try later!
1. Central limit theorem
2. Special properties of the standard deviation
3. Standard deviation
What is the DMAIC framework?
Give this one a try later!
1. Define the problem
2. Measure the problem by collecting data
3. Analyze the situation including the data that was collected
4. Improve the process
5. Control (develop and institute control systems to ensure the process will
perform as expected)
T/F: The Upper Control Limit is set at the target plus three times the standard error of
the mean.
Give this one a try later!