Give this one a try later!
responsible for setting up a vision for Six Sigma implementation
Which of the below statistical tests helps in decision making based on data
inferences?
Give this one a try later!
Hypothesis Test
,"Missing component detection that stops the process when triggered" this is an
example of...
Give this one a try later!
Process interruption
•1930 - _____ and _________ Introduce Acceptance Sampling Methods
Give this one a try later!
Dodge and Romig
-Probabilistic approach to predicting lot acceptability based on sampling
results. Centered on defect detection; concept of acceptable quality level
(AQL)
Poka-yoke
Andon
Autonomation
5 ways
LIne stops
Built in Quality
Give this one a try later!
JIDOKA
,As we begin to describe the things occurring with our process through a Process
Map we begin to see some steps that are NVA which stands for ____________.
Give this one a try later!
Non-value add
•1980 - "Quality Revolution" Begins in America
Give this one a try later!
-NBC airs a white paper entitle "If Japan Can, Why Can't We?"
-Deming hired by Ford as a consultant
Which of the following would likely not be a CTQ (Critical-to-Quality) for the
purchase of a product?
A. Functionality
B. Durability
C. Dependability
D. None
Give this one a try later!
None
How might you display central location on a nominal scale?
Give this one a try later!
, Mode
Black Belts
Give this one a try later!
hey primarily focus on Six Sigma project execution and special leadership
with special tasks
Why is the Value Stream Mapping (Current State) technique used?
Give this one a try later!
Identifying causes of waste and opportunities for improvement
A ______________ is a graphical presentation of sample data that shows the number of times
that a data point is a specific number.
Give this one a try later!
Histogram
As part of a Visual Factory plan _____________ are created and utilized to identify areas in
need of cleaning and organization.
Give this one a try later!