1 Builder - ✔✔✔-How many builders can a salesman work for at the same time?
1. Determine the regular wage for the week.
Multiply: $5.00/ hour X 40 hours at hourly wage = $200
2. Determine the overtime rate.
$5.00 x 1.5 = $7.50
3. Calculate the total overtime.
$7.50 x 7 hours of overtime = $52.50
4. Add the total weekly wage.
$200 + $52.50 = $252.50
Answer is $253.50 - ✔✔✔-A nonexempt, hourly painter employed by your company earns
$5.00 hour. The employee works 47 hours in a work week. According to the Minimum Wage
Law of 1964, calculate the employees gross wage for the week?
a.) $200.25
b.) $225.75
c.) $243.50
d.) $253.50
1. Multiply the gable roof measurement and the rafter height.
44 x 16 = 704 square feet
,MI Builders Class Exam Study Guide with Questions and Answers – 100% Solved
2. Since there are 2 sides to the gable roof, multiply by 2.
704 x 2 = 1,408 square feet
3. Determine the size of the plywood. Multiply the plywood size.
4 x 8 = 32 square feet per sheet of plywood.
4. Determine the number of sheets. Area of the roof divided by the plywood size.
1,408 square feet of roof area / 32 square feet per sheet = 44 sheets of plywood required. -
✔✔✔-You are constructing a gable roof on a new residential home. The roof measures 44 feet
long. The 16-foot roof rafters are spaced 24" on center. What is the total number of 4 X 8 sheets
of plywood are needed to deck the roof?
a.) 20
b.) 44
c.) 48
d.) 52
1/4 = 1 inch 1:48 - ✔✔✔-commonly used size for scale of drawings
1/4" = 1' One-forty-eight size 1:48 - ✔✔✔-1/4" = 1' One-forty-eight size 1:48
15 days - ✔✔✔-How many days do you have to respond to a complaint?
15 Days - ✔✔✔-Time allotted for department to acknowledge receipt of complaint to
complainant?
,MI Builders Class Exam Study Guide with Questions and Answers – 100% Solved
15 Days - ✔✔✔-Time allotted to respond to a formal complaint
18 Months - ✔✔✔-File a complaint
18 Months - ✔✔✔-How many months does a person have to file a complaint against you?
2 Terms - ✔✔✔-How many terms can a board member be on the board?
2, 4 Year terms - ✔✔✔-What is the term limit for a board member?
25 feet - ✔✔✔-The escape devices for a trench over 4 feet deep must be within a maximum of
how many feet of the worker?
3 hours - ✔✔✔-What is the minimum educational hours per year?
3 people witch 1 of them must be a Inspector - ✔✔✔-How many general public people are on
the board?
3 years - ✔✔✔-How long is a license good for?
34 - 36 inches - ✔✔✔-height of hand rail?
36 - 38 inches - ✔✔✔-Height of the door handle?
40 feet x 16 feet = 640 square feet
640 square feet x 2 sides = 1280 square feet
, MI Builders Class Exam Study Guide with Questions and Answers – 100% Solved
(1280 square feet / 100 ft/square) = 12.80 squares or
13 total squares - ✔✔✔-Calculate the number of squares of shingles needed to cover a gable
roof 40 ft. in length and 16 ft. wide on each side (disregard for caps and starter).
a.) 6.5 squares
b.) 13 squares
c.) 640 squares
d.) 1280 squares
42 hours - ✔✔✔-How many educational hours are required for your first 6 years?
43,560 SQ FT - ✔✔✔-How many square feet are in 1 Acre?
5 Days - ✔✔✔-How many days do you have to return a sales License?
5.7 sq Feet - ✔✔✔-Egress window size clearance
5.7 sq ft - ✔✔✔-What sq ft is required for a basement Egress window
6 Members - ✔✔✔-How many board members are of a licensed occupation?
A.) $25.00 - ✔✔✔-The Home Solicitation Sales Act 227 requires a written contract if the dollar
amount is more than _______.
A.) $25.00
B.) $100.00